| Sr.No. | Sector Name | Project Count (in no.) |
Original (Revised) Cost (in cr.) |
Expenditure Cost (in cr.) |
|---|
| Original Approved Cost (in cr.) | Revised Cost (in cr.) | Cumulative Expenditure(in cr.) |
|---|
| Sr.No. | Physical Progress slab (%) |
Project Count (in no.) |
Original (Revised) Cost (in cr.) |
Expenditure Cost (in cr.) |
|---|
| Sr.No. | State Name | Project Count (in no.) |
Original (Revised) Cost (in cr.) |
Expenditure Cost (in cr.) |
|---|
| Sr. No. | Sector Name | Line Ministry | Project Code | Project Name | Original Cost (in cr.) |
Revised Cost (in cr.) |
Expenditure (in cr.) |
Original End Date | Revised Date |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Real Estate | Department for Promotion of Industry & Internal Trade | 701657 | Tumakuru Node - Phase 1 - Roads and Services Development | 1702 | 117.35 | 21/09/2026 | ||
| 2 | Real Estate | Department for Promotion of Industry & Internal Trade | 701658 | Krishnapatnam Node - Phase 1 - Roads and Services Development | 2139 | 472.8 | 15/02/2028 | ||
| 3 | Education | Department of Higher Education | 602098 | Construction of Permanent Campus for IIM Jammu Phase-1 at Jagti, Nagrota, Jammu, J&K | 425 | 500.91 | 484.52 | 30/06/2023 | 30/11/2025 |
| 4 | Education | Department of Higher Education | 602099 | Establishment of Permanent campus Phase 1 of IIM Sirmaur | 393 | 454.78 | 326.24 | 31/10/2023 | 28/02/2026 |
| 5 | Education | Department of Higher Education | 605292 | Construction of Permanent Campus of Indian Institute of Management [IIM] Amritsar, Punjab, Phase-I | 348 | 290.39 | 30/06/2023 | 31/12/2025 | |
| 6 | Education | Department of Higher Education | 606013 | Additional Campus of NITPatna | 499 | 441.47 | 31/07/2024 | 31/01/2026 | |
| 7 | Education | Department of Higher Education | 606112 | Tezpur University Projects | 154 | 124.33 | 08/11/2023 | 31/10/2025 | |
| 8 | Education | Department of Higher Education | 606431 | CONSTRUCTION OF PERMANENT CAMPUS FOR IIT PALAKKAD UNDER PHASE 1A | 1006 | 1217.4 | 641.73 | 07/06/2022 | 30/11/2026 |
| 9 | Education | Department of Higher Education | 606479 | Banaras Hindu University [ Kayakalp of Institute of Medical Sciences] | 246 | 198.02 | 30/09/2022 | 31/03/2026 | |
| 10 | Education | Department of Higher Education | 609019 | HEFA projects on development of student hostels, playgrounds, departmental buildings, class room complex and other campus facilities in IIT Kharagpur | 500 | 442 | 390.6 | 31/03/2023 | 31/03/2026 |
| 11 | Education | Department of Higher Education | 609736 | Construction of Sikkim University Campus Phase-I Package-II at Yangang, South Sikkim | 314 | 238.22 | 04/01/2025 | 31/03/2026 | |
| 12 | Education | Department of Higher Education | 609996 | Construction of Precast housing and hostels at IIT Hyderabad | 262 | 186.49 | 23/10/2024 | 01/01/2026 | |
| 13 | Education | Department of Higher Education | 610315 | IISER BERHAMPUR | 1229 | 773.76 | 838.21 | 31/03/2021 | 31/12/2025 |
| 14 | Education | Department of Higher Education | 610940 | Additional Infrastructure at IISc Bangalore-RCC Monolithic for Men Hostel S14, Women Hostel S11 , Postdoctoral Hostel S12 2 Block , International Hostel S 12 , D&E Block S 12 2 Block FR. | 420 | 420.41 | 364.44 | 31/03/2024 | 31/12/2025 |
| 15 | Education | Department of Higher Education | 611957 | Phase III A works at IIT Indore [03 Hostels, 01 Studio Apartment, 01 Housing, Heavy & Sophisticated lab complex, Academic POD and Infrastructure for center of excellence] | 496 | 38.62 | 19/02/2027 | ||
| 16 | Education | Department of Higher Education | 611963 | Construction & Development of Infrastructural Facilities in the main campus of NIT Uttarakhand at Sumari, Pauri Garhwal | 651 | 195.52 | 30/09/2027 | ||
| 17 | Education | Department of Higher Education | 612128 | Hostel blocks & dining hall block | 167 | 85.92 | 26/03/2026 | 26/03/2026 | |
| 18 | Education | Department of Higher Education | 612135 | Hostel 4 -Earlier Known as Hostel 20 | 182 | 156.51 | 30/09/2025 | 31/12/2025 | |
| 19 | Education | Department of Higher Education | 612203 | Academic Block 1 & 2 | 68 | 263.93 | 27.4 | 31/07/2026 | 31/03/2027 |
| 20 | Education | Department of Higher Education | 612851 | Phase 1B - Construction of Academic Block, Hostel, Residential Tower, Directors Residence and External Development works at National Institute of Technology, Delhi Campus on Engineering, Procurement and Construction basis | 333 | 336.42 | 291.33 | 30/09/2025 | |
| 21 | Education | Department of Higher Education | 612876 | Construction of Permanent Campus for NIT Mizoram at Lengpui, Aizawl | 474 | 474.23 | 167.55 | 31/12/2029 | 31/12/2029 |
| 22 | Education | Department of Higher Education | 612877 | Establishment of NIT Puducherry Permanent Campus [Phase-I and Phase-II] | 618 | 544.34 | 529.9 | 31/12/2024 | 31/08/2025 |
| 23 | Education | Department of Higher Education | 612883 | Establishment of Permanent Campus of NIT SIkkim at Khamdong-Gangtok District | 686 | 610.76 | 121.56 | 12/02/2028 | 31/12/2026 |
| 24 | Education | Department of Higher Education | 612885 | Construction and Developement of National Institute of Technology Meghalaya Permanent Campus at Sohra | 495 | 419.57 | 31/03/2022 | 31/07/2025 | |
| 25 | Education | Department of Higher Education | 612894 | Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra, District - Kangra, [H.P.] on Engineering. Procurement and Construction [EPC Mode 1] Basis. | 252 | 300.45 | 183.47 | 18/11/2024 | 30/11/2025 |
| 26 | Education | Department of Higher Education | 612898 | Construction of Permanent Campus of National Institute of Technology Arunachal Pradesh | 593 | 550.27 | 31/08/2026 | ||
| 27 | Education | Department of Higher Education | 612916 | Construction of permanent campus of Central University of Gujarat at Village kundhela, Dist. Vadodara, Gujarat. | 491 | 313.84 | 31/03/2025 | 31/03/2026 | |
| 28 | Education | Department of Higher Education | 613008 | Construction of Permanent Campus of Central Tribal University of Andhra Pradesh Phase-1 | 305 | 19.96 | 26/06/2027 | ||
| 29 | Education | Department of Higher Education | 613013 | Establishment of NIT Nagaland | 276 | 261.24 | 31/12/2025 | ||
| 30 | Education | Department of Higher Education | 616886 | Delhi University Eastern Campus at Surajmal Vihar | 373 | 21.63 | 31/10/2026 | ||
| 31 | Education | Department of Higher Education | 617221 | Construction of Girls Hostel 400 seater, Boys Hostel 600 seater, Academic Block, International Hostel 100 seater, VC Residence and Purchase of Equipment | 211 | 03/10/2027 | |||
| 32 | Education | Department of Sports | 400081 | National Sports University [NSU], Imphal [Manipur] | 906 | 611.74 | 553.38 | 26/08/2024 | 16/11/2025 |
| 33 | Telecommunication | Department of Telecommunications | 400013 | Saturation 4G mobile coverage of Uncovered Villages through USOF | 26316 | 30620 | 9791.8 | 20/06/2024 | 31/03/2026 |
| 34 | Telecommunication | Department of Telecommunications | 617413 | Mobile connectivity in Left Wing Extremism [LWE] affected areas-Phase 1 Upgradation | 1885 | 100 | 08/05/2025 | 08/11/2025 | |
| 35 | Telecommunication | Department of Telecommunications | 701593 | 4G Services by BSNL | 28466 | 19592 | 8419.04 | 31/03/2024 | 31/03/2026 |
| 36 | Telecommunication | Department of Telecommunications | 701597 | Provision of 4G Mobile Services in Uncovered Villages of Arunachal Pradesh and 2 Districts of Assam | 1255 | 284.04 | 30/04/2023 | 31/03/2026 | |
| 37 | Telecommunication | Department of Telecommunications | 701598 | Provision of 4G based Mobile Services in Uncovered Villages and National Highways of Meghalaya | 972 | 208.25 | 03/03/2022 | 31/03/2026 | |
| 38 | Telecommunication | Department of Telecommunications | 701599 | Mobile connectivity in Left Wing Extremism [LWE] affected areas-Phase2 | 1578 | 600.6 | 31/03/2023 | 08/11/2025 | |
| 39 | Telecommunication | Department of Telecommunications | 701600 | 354 Uncovered Villages Scheme | 337 | 301.13 | 227.82 | 27/10/2021 | 31/08/2025 |
| 40 | Telecommunication | Department of Telecommunications | 701602 | Provision of 4G based mobile services in 7,287 uncovered villages of 44 Aspirational District across 5 states of Andhra Pradesh, Chhattisgarh, Jharkhand, Maharashtra & Odisha | 3685 | 1135.28 | 19/11/2023 | 19/11/2025 | |
| 41 | Telecommunication | Department of Telecommunications | 704495 | 502 Aspirational District Scheme in Four states - Bihar, Madhya Pradesh, Rajastha and Uttar Pradesh | 422 | 228.94 | 142.01 | 16/03/2022 | 21/12/2025 |
| 42 | Telecommunication | Department of Telecommunications | 706775 | BharatNet | 61109 | 188000 | 46431.5 | 31/08/2023 | 31/03/2027 |
| 43 | Telecommunication | Department of Telecommunications | 709749 | PHASE-I OF CONSOLIDATION OF EXISTING CDR DATA CENTERS AND NIB-P3 DATA CENTERS WITH STATE OF THE ART | 461 | 166.02 | 18/06/2021 | 31/12/2025 | |
| 44 | Telecommunication | Department of Telecommunications | 709856 | MPLS-IP BASED ACCESS AND AGGREGATION NETWORK [MAAN] IN BSNL ALONG WITH TEST AND MEASURING EQUIPMENT | 645 | 377.27 | 31/08/2024 | 31/10/2025 | |
| 45 | Telecommunication | Department of Telecommunications | 709857 | Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration & Annual Maintenance of 4G mobile network at 1 Lakh sites on PAN India basis including Mumbai & Delhi LSA on turnkey basis under Phase IX.2 Project. | 24545 | 8448.06 | 21/06/2025 | 31/03/2026 | |
| 46 | Telecommunication | Department of Telecommunications | 709858 | OPTICAL TRANSPORT NETWORK [OTN] PH-4 IN BSNL | 811 | 786.3 | 15/08/2025 | 30/11/2025 | |
| 47 | Telecommunication | Department of Telecommunications | 709859 | SETTING UP OF PHYSICAL INFRASTRUCTURE FOR THE NATIONAL INSTITUTE OF COMMUNICATION FINANCE [NICF] AT GHITORNI | 248 | 236.91 | 17/02/2020 | 31/10/2025 | |
| 48 | Waste & Water | Department of Water Resources, River Development & GR | 616594 | Interception & Diversion with Rehabilitation of sewerage scheme at Agra under Hybrid annuity based PPP model-Namami Gange Programme | 842 | 208.64 | 30/04/2025 | 31/12/2025 | |
| 49 | Waste & Water | Department of Water Resources, River Development & GR | 616600 | Interception and Diversion and STP works in Bhagalpur under Hybrid annuity based PPP mode-Namami Gange Programme | 413 | 126.67 | 06/02/2025 | 31/12/2025 | |
| 50 | Waste & Water | Department of Water Resources, River Development & GR | 616604 | Pollution Abatement works for River Ganga at Hooghly Chinsurah- Municipal Town Interception & Diversion with STP | 155 | 96.17 | 30/03/2025 | 31/12/2025 | |
| 51 | Waste & Water | Department of Water Resources, River Development & GR | 616605 | Pollution Abatement Works for River Kali Meerut under Meerut Municipality Interception & Diversion with STP | 691 | 34.79 | 31/12/2024 | 11/05/2027 | |
| 52 | Waste & Water | Department of Water Resources, River Development & GR | 616611 | Sewage Treatment Plant 100MLD and Sewerage Network 288 km in Digha-Patna under Hybrid annuity based PPP mode-Namami Gange Programme | 824 | 396.71 | 30/12/2025 | ||
| 53 | Waste & Water | Department of Water Resources, River Development & GR | 616612 | Sewage Treatment Plant 50MLD and Sewerage Network 150 km in Kankarbagh-Patna under Hybrid annuity based PPP mode-Namami Gange Programme | 579 | 171.79 | 30/12/2025 | ||
| 54 | Waste & Water | Department of Water Resources, River Development & GR | 616615 | Sewer Network, SPS and STP at Begusarai | 230 | 261.82 | 30/04/2025 | 31/12/2025 | |
| 55 | Waste & Water | Department of Water Resources, River Development & GR | 616616 | Sewer Networks, SPS and STP at Hajipur | 305 | 346.46 | 30/06/2025 | 31/12/2025 | |
| 56 | Water Resources | Department of Water Resources, River Development & GR | 400093 | Saryu Nahar CADWM Project | 1673 | 22.24 | 31/12/2019 | 31/03/2026 | |
| 57 | Water Resources | Department of Water Resources, River Development & GR | 400095 | Gosikhurd CADWM Project | 744 | 295.12 | 31/12/2019 | 30/06/2026 | |
| 58 | Water Resources | Department of Water Resources, River Development & GR | 400096 | Omkareshwar CADWM Project | 648 | 648.09 | 172.56 | 31/12/2019 | 31/03/2026 |
| 59 | Water Resources | Department of Water Resources, River Development & GR | 400097 | Sardar Sarovar CADWM Project | 5022 | 6670.31 | 4954.99 | 31/12/2019 | 31/03/2026 |
| 60 | Water Resources | Department of Water Resources, River Development & GR | 400100 | Sardar Gouthu Latchanna Thotapalli Barrage Project | 353 | 1023.24 | 869.11 | 31/12/2019 | 30/06/2026 |
| 61 | Water Resources | Department of Water Resources, River Development & GR | 400101 | Gundlakamma project | 397 | 697.39 | 619.09 | 31/12/2019 | 31/03/2027 |
| 62 | Water Resources | Department of Water Resources, River Development & GR | 400102 | Sri Ram Sagar Project Stage - II | 736 | 949.87 | 940.7 | 31/12/2019 | 31/03/2026 |
| 63 | Water Resources | Department of Water Resources, River Development & GR | 400103 | Indiramma Flood Flow Canal Project | 1331 | 5940.09 | 4491.08 | 31/12/2019 | 31/12/2026 |
| 64 | Water Resources | Department of Water Resources, River Development & GR | 400104 | Punpun Barrage Project | 571 | 658.12 | 447.68 | 31/12/2019 | 31/03/2026 |
| 65 | Water Resources | Department of Water Resources, River Development & GR | 400105 | Urmodi Irrigation Project | 581 | 895.81 | 713.46 | 30/06/2022 | 31/12/2026 |
| 66 | Water Resources | Department of Water Resources, River Development & GR | 400107 | Sulwade-Jamphal-Kanoli Lift Irrigation Scheme | 2408 | 2570.94 | 30/06/2023 | 30/06/2027 | |
| 67 | Water Resources | Department of Water Resources, River Development & GR | 400109 | Purna Barrage-2 [Ner Dhamana] Medium Irrigation Project | 848 | 888.43 | 690.49 | 30/06/2020 | 30/06/2026 |
| 68 | Water Resources | Department of Water Resources, River Development & GR | 400111 | Kelo Irrigation Project | 460 | 727.04 | 616.93 | 31/12/2019 | 30/06/2026 |
| 69 | Water Resources | Department of Water Resources, River Development & GR | 400112 | Jigaon Irrigation Project | 7223 | 8722.81 | 30/06/2028 | ||
| 70 | Water Resources | Department of Water Resources, River Development & GR | 400115 | Bargi Diversion Project Phase - IV [km. 154 to km 197] | 751 | 893.35 | 783.1 | 31/12/2019 | 31/03/2026 |
| 71 | Water Resources | Department of Water Resources, River Development & GR | 400116 | Bargi Diversion Project Phase - III [km. 104 to km 154] | 1229 | 1399.7 | 1937.25 | 31/12/2019 | 31/03/2026 |
| 72 | Water Resources | Department of Water Resources, River Development & GR | 603945 | Integrated Anandpur Barrage Project | 567 | 2990.05 | 2629.74 | 31/12/2019 | 30/06/2026 |
| 73 | Water Resources | Department of Water Resources, River Development & GR | 613787 | Jamrani Dam Multipurpose Project | 2584 | 968.52 | 28/06/2029 | ||
| 74 | Water Resources | Department of Water Resources, River Development & GR | 617422 | Bodwad Parisar Sinchan Yojna | 1924 | 1770.13 | 31/07/2027 | ||
| 75 | Water Resources | Department of Water Resources, River Development & GR | 701370 | Borolia Irrigation Project | 256 | 44.7 | 31/12/2022 | 31/03/2026 | |
| 76 | Water Resources | Department of Water Resources, River Development & GR | 701372 | Sardar Sarovar Project | 20718 | 33412.5 | 31860.9 | 31/12/2019 | 31/03/2026 |
| 77 | Water Resources | Department of Water Resources, River Development & GR | 701376 | Subernarekha Multipurpose Project, Jharkhand | 3808 | 9579.58 | 5790.29 | 31/12/2019 | 31/03/2026 |
| 78 | Water Resources | Department of Water Resources, River Development & GR | 701377 | Upper Tunga Irrigation Project | 770 | 1606.07 | 1515.32 | 31/12/2019 | 31/03/2026 |
| 79 | Water Resources | Department of Water Resources, River Development & GR | 701383 | Waghur Project | 1059 | 1758.51 | 1557.45 | 31/12/2019 | 31/03/2026 |
| 80 | Water Resources | Department of Water Resources, River Development & GR | 701386 | Gosikhurd Project | 7196 | 12770.1 | 13765.2 | 31/12/2019 | 30/06/2028 |
| 81 | Water Resources | Department of Water Resources, River Development & GR | 701391 | Aruna Medium Irrigation Project | 210 | 1472.14 | 1697.94 | 31/12/2019 | 31/12/2025 |
| 82 | Water Resources | Department of Water Resources, River Development & GR | 701395 | Morna [Gureghar] Irrigation Project | 220 | 115.2 | 31/12/2025 | ||
| 83 | Water Resources | Department of Water Resources, River Development & GR | 701396 | Lower Pedhi Project | 256 | 1480.7 | 1324.98 | 31/12/2019 | 30/06/2026 |
| 84 | Water Resources | Department of Water Resources, River Development & GR | 701398 | Nardave Medium Irrigation Project | 211 | 781.85 | 623.5 | 31/12/2019 | 30/06/2026 |
| 85 | Water Resources | Department of Water Resources, River Development & GR | 701399 | Kudali Irrigation Project | 382 | 239.03 | 31/12/2025 | ||
| 86 | Water Resources | Department of Water Resources, River Development & GR | 701400 | Thoubal Multipurpose Project | 1449 | 1822.24 | 1837.91 | 31/12/2019 | 31/03/2026 |
| 87 | Water Resources | Department of Water Resources, River Development & GR | 701404 | Kanupur Irrigation Project | 989 | 2301.28 | 2712.75 | 31/12/2019 | 30/06/2026 |
| 88 | Water Resources | Department of Water Resources, River Development & GR | 701405 | J. Chokka Rao Devadula Lift Irrigation Scheme | 8201 | 14730 | 4664.8 | 31/12/2019 | 31/12/2025 |
| 89 | Water Resources | Department of Water Resources, River Development & GR | 701406 | Rajiv Bhima Lift Irrigation Scheme | 1402 | 2509.66 | 1839.76 | 31/12/2019 | 31/03/2026 |
| 90 | Water Resources | Department of Water Resources, River Development & GR | 701408 | Madhya Ganga canal Phase-II | 1061 | 4417.21 | 4552.44 | 31/12/2019 | 31/12/2025 |
| 91 | Water Resources | Department of Water Resources, River Development & GR | 701410 | Relining of Rajasthan feeder and Sirhind Feeder canal | 1441 | 2462.16 | 3012.69 | 30/06/2021 | 30/06/2026 |
| 92 | Water Resources | Department of Water Resources, River Development & GR | 701411 | Shahpur Kandi Dam Project | 2286 | 2715.7 | 2169.72 | 30/06/2022 | 31/10/2025 |
| 93 | Water Resources | Department of Water Resources, River Development & GR | 701412 | North Koel Reservoir Project | 1622 | 2430.76 | 151.04 | 31/03/2021 | 31/03/2026 |
| 94 | Water Resources | Department of Water Resources, River Development & GR | 701415 | Polavaram Irrigation Project | 10151 | 55548.9 | 24838 | 30/04/2022 | 31/03/2026 |
| 95 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 400010 | Construction of Terminal Building & Associated works at Leh Airport, Ladakh | 480 | 640 | 471.59 | 14/09/2021 | 31/10/2025 |
| 96 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 611047 | Construction of NTB complex including apron, taxi track and other associated civil works and electrical & mechanical installations towards Tawi River side at CA Jammu. | 861 | 861.37 | 212.12 | 21/06/2026 | 21/06/2026 |
| 97 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 611495 | Development of New Civil Enclave at Bagdogra Airport | 1549 | 1549 | 310.58 | 03/01/2027 | 03/01/2027 |
| 98 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 611570 | SITC of ATM Automation System and ASMGCS [Including SMR & MLAT] for Mumbai, Navi Mumbai, Jewar [earlier MOPA, without ASMGCS], HIAL & BIAL | 500 | 332.26 | 11/09/2025 | 31/08/2026 | |
| 99 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 611602 | Modernization of Chennai Airport, Phase II, Part 2 | 1207 | 183.02 | 31/07/2025 | 30/06/2026 | |
| 100 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612063 | Construction of New Terminal Building, Second Link Taxi Track, Apron Expansion, and associated works at Prayagraj Airport- On Design & Build Basis. | 219 | 274.38 | 215.2 | 19/11/2024 | 31/08/2025 |
| 101 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612183 | Development of New Civil Enclave at Bihta | 1413 | 30/09/2027 | |||
| 102 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612194 | Development of New Civil Enclave and associated works at Darbhanga Airport | 912 | 213.22 | 07/01/2026 | ||
| 103 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612786 | Construction of New Domestic Terminal Building Building and miscellaneous works including maintenance, operations and AICMC at Kadapa Airport | 266 | 67.22 | 27/01/2026 | 31/03/2026 | |
| 104 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612787 | Construction of New Domestic Terminal Building and Miscellaneous works at Hubli Airport | 320 | 81.22 | 21/01/2026 | 31/03/2026 | |
| 105 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612788 | Construction of New Domestic Terminal Building and Miscellaneous Works at Belagavi Airport. | 322 | 140.4 | 02/01/2026 | 02/01/2026 | |
| 106 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612789 | Development of additional RESA on either end on Runway 10-28 at Calicut Airport. Construction of embankment with slope protection, drainage system and associated works for additional RESA on either end on Runway 10-28 | 485 | 91.67 | 28/09/2025 | 16/03/2026 | |
| 107 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612791 | Re-Construction of Rigid portions of Secondary Runway, K and A Taxiway and Strengthening of C Taxiway at NSCBI Airport Kolkata. | 328 | 107.6 | 10/02/2025 | 31/08/2026 | |
| 108 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 612793 | Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance. | 323 | 38.69 | 06/02/2026 | ||
| 109 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701091 | Lucknow Airport-Terminal 3- Phase 1 & Other Associated Works | 3100 | 16024.4 | 31/03/2026 | ||
| 110 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701101 | Construction of New Domestic Terminal Building [Phase-I and II] and other allied structures at JPNI Airport, Patna | 1217 | 1216.9 | 1125.73 | 31/07/2023 | 30/11/2025 |
| 111 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701105 | Goa Airport Terminal Building Extension Project | 256 | 255.69 | 154.3 | 09/12/2021 | 30/09/2025 |
| 112 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701107 | Construction of New Integrated Terminal Building and associated works including apron to park 3 code E type of aircraft or 6 code C type of aircraft at Vijayawada Airport. | 612 | 611.8 | 507.14 | 05/09/2022 | 31/12/2025 |
| 113 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701113 | Development of Lal Bahadur Shastri International airport, Varanasi including C/o New Terminal Building, Apron Extension, Runway Extension, PTT and allied works. | 2870 | 361.71 | 20/07/2027 | 20/07/2027 | |
| 114 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701121 | Construction of New Domestic Terminal Building at Rajahmundry Airport. | 347 | 102.43 | 14/08/2025 | 31/12/2025 | |
| 115 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701122 | Development of New Integrated Civil Enclave at Agra Airport | 579 | 88.64 | 04/07/2026 | ||
| 116 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701126 | Development of Dholera International Greenfield Airport , Gujarat | 1305 | 1551 | 718.2 | 30/06/2026 | 30/06/2026 |
| 117 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701127 | Construction of New Passenger Terminal Building for Domestic Operations at Jodhpur Airport. | 480 | 480 | 317.88 | 18/11/2024 | 30/11/2025 |
| 118 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 701128 | Construction of New Integrated Passenger Terminal Building at Udaipur Airport | 887 | 887 | 378.81 | 10/03/2026 | 03/10/2026 |
| 119 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 706718 | C/o NITB Imphal Airport | 499 | 499 | 155.72 | 13/07/2024 | 31/12/2026 |
| 120 | Aviation & Aviation Infrastructure | Ministry of Civil Aviation | 706724 | Guwahati Airport New Integrated Terminal Building Construction Project | 1712 | 2397.37 | 31/03/2025 | 30/11/2025 | |
| 121 | Coal | Ministry of Coal | 400018 | HURA C OCP | 859 | 451.62 | 31/03/2029 | ||
| 122 | Coal | Ministry of Coal | 400033 | BHATADI EXPANSION OC | 581 | 73.77 | 31/03/2028 | ||
| 123 | Coal | Ministry of Coal | 400073 | KONAR EXPANSION OCP | 799 | 429.65 | 31/03/2032 | ||
| 124 | Coal | Ministry of Coal | 400074 | KARO EXPANSION OCP | 908 | 269.26 | 31/03/2029 | ||
| 125 | Coal | Ministry of Coal | 400136 | SANGHMITRA OC | 2660 | 31/03/2032 | |||
| 126 | Coal | Ministry of Coal | 400138 | CHANDRAGUPT OCP | 974 | 440.56 | 31/03/2032 | ||
| 127 | Coal | Ministry of Coal | 400139 | KOTRE BASANTPUR PACHMO OCP | 861 | 625.4 | 455.95 | 31/03/2032 | |
| 128 | Coal | Ministry of Coal | 400142 | Pachwara South Coal Block | 2243 | 1220.76 | 30/09/2028 | ||
| 129 | Coal | Ministry of Coal | 400144 | PORDA CHIMTAPANI OCP [10 MTY] | 2310 | 87.97 | 31/03/2029 | ||
| 130 | Coal | Ministry of Coal | 400145 | CHHAL OC SEAM III [6 MTY] | 611 | 579.82 | 31/03/2022 | 30/11/2025 | |
| 131 | Coal | Ministry of Coal | 400148 | AMADAND OCP[4.0MTY] | 869 | 275.35 | 31/03/2021 | 31/03/2027 | |
| 132 | Coal | Ministry of Coal | 400149 | BAROUD OC EXPANSION [3.0-10.0M | 2310 | 937.38 | 31/03/2029 | ||
| 133 | Coal | Ministry of Coal | 400150 | RPR MAGADH EXP OCP | 7254 | 1600.77 | 31/03/2028 | ||
| 134 | Coal | Ministry of Coal | 400151 | NORTH URIMARI EXPANSION OCP | 779 | 696.05 | 31/03/2029 | ||
| 135 | Coal | Ministry of Coal | 400152 | RAMPUR BATURA OCP [4.0MTY] | 1249 | 498.04 | 31/03/2026 | ||
| 136 | Coal | Ministry of Coal | 400153 | EPR ROHINI - KARKETTA OCP | 1020 | 84.74 | 31/03/2028 | ||
| 137 | Coal | Ministry of Coal | 400154 | EPR PUNDI OCP | 713 | 236.58 | 31/03/2027 | ||
| 138 | Coal | Ministry of Coal | 400155 | EPR ASHOK OC | 2898 | 179.7 | 31/03/2031 | ||
| 139 | Coal | Ministry of Coal | 400156 | EPR AMRAPALI OCP | 5136 | 1168.11 | 31/03/2028 | ||
| 140 | Coal | Ministry of Coal | 400160 | RAJRAPPA RCE OCP | 511 | 488.69 | 31/03/2016 | 31/03/2027 | |
| 141 | Coal | Ministry of Coal | 400162 | BLOCK B EXPANSION [3.5 TO 8.0 | 999 | 470.87 | 31/03/2023 | 31/03/2027 | |
| 142 | Coal | Ministry of Coal | 400165 | SUBHADRA OCP | 1694 | 1323.62 | 23/04/2032 | ||
| 143 | Coal | Ministry of Coal | 400166 | SIARMAL OCP | 5195 | 3456.93 | 31/03/2029 | ||
| 144 | Coal | Ministry of Coal | 400172 | CHITRA EAST OC | 514 | 229.86 | 31/03/2026 | 31/03/2028 | |
| 145 | Coal | Ministry of Coal | 400173 | MOHANPUR EXPANSION OC -PHASE I | 889 | 115.8 | 31/03/2026 | 31/03/2030 | |
| 146 | Coal | Ministry of Coal | 400177 | AMALGAMATED YEKONA I & YEKONA | 727 | 539.93 | 31/03/2025 | 31/03/2026 | |
| 147 | Coal | Ministry of Coal | 400178 | DINESH[MAKARDHOKRA-III] OC | 823 | 621.94 | 31/03/2027 | ||
| 148 | Coal | Ministry of Coal | 400180 | BONJEMEHARI EXPANSION OCP | 570 | 570.11 | 82.25 | 31/03/2026 | 31/03/2030 |
| 149 | Coal | Ministry of Coal | 400181 | NAKRAKONDA KUMARDIH- B OCP | 503 | 502.67 | 71.11 | 31/03/2029 | |
| 150 | Coal | Ministry of Coal | 400182 | SIDULI [OC & UG] | 535 | 535.17 | 5.28 | 31/03/2027 | 31/03/2030 |
| 151 | Coal | Ministry of Coal | 400183 | BALARAM EXPANSION OCP | 3504 | 922.92 | 31/03/2029 | ||
| 152 | Coal | Ministry of Coal | 400185 | GOPALJI KANIHA OCP [10 TO 30 M | 8416 | 6107.87 | 1734.86 | 31/03/2030 | |
| 153 | Coal | Ministry of Coal | 400186 | TILABONI UG | 749 | 749.07 | 52.55 | 31/03/2029 | |
| 154 | Coal | Ministry of Coal | 400187 | INTEGRATED LAKHANPUR-BELPAHAR- | 2435 | 1834.91 | 31/03/2027 | ||
| 155 | Coal | Ministry of Coal | 400312 | JHANJRA EXPANSION UG | 1210 | 537.77 | 31/03/2029 | ||
| 156 | Coal | Ministry of Coal | 400313 | Master Plan for Jharia and Raniganj Coalfields | 2662 | 791.42 | 11/08/2019 | 31/12/2028 | |
| 157 | Coal | Ministry of Coal | 400315 | SONEPUR BAZARI EXPANSION OCP [ | 5366 | 583.82 | 31/03/2029 | ||
| 158 | Coal | Ministry of Coal | 400321 | NIGAHI EXPANSION [15 TO 25 MTP | 1730 | 833.62 | 31/03/2025 | 31/03/2028 | |
| 159 | Coal | Ministry of Coal | 400352 | JHARKHAND-LAIYO OCP | 765 | 145.81 | 31/03/2031 | ||
| 160 | Coal | Ministry of Coal | 400353 | DHUPTALA OC [SASTI UG TO OC ] | 711 | 169.11 | 31/03/2028 | ||
| 161 | Coal | Ministry of Coal | 400354 | DIPKA EXPANSION OCP [40 MTY] | 5241 | 2841.08 | 31/03/2029 | ||
| 162 | Coal | Ministry of Coal | 400369 | BINA KAKRI AMALGAMATION EXPANS | 836 | 809.2 | 31/03/2024 | 31/03/2027 | |
| 163 | Coal | Ministry of Coal | 400392 | BHARATPUR RE-ORGANIZATION OCP | 2839 | 1673.49 | 31/03/2029 | ||
| 164 | Coal | Ministry of Coal | 400424 | GEVRA OC [70 MTY] | 11816 | 6687.44 | 31/03/2023 | 31/03/2026 | |
| 165 | Coal | Ministry of Coal | 400425 | MOONIDIH XV SEAM UG | 1230 | 631.73 | 31/03/2019 | 31/05/2026 | |
| 166 | Coal | Ministry of Coal | 611016 | 2.0 MTPA BHOJUDIH NLW WASHERY | 385 | 354.75 | 30/09/2020 | 31/12/2025 | |
| 167 | Coal | Ministry of Coal | 611017 | 2.5 MTPA PATHERDIH NLW WASHERY | 334 | 142.64 | 30/04/2018 | 31/03/2026 | |
| 168 | Coal | Ministry of Coal | 611864 | AMALAGAMATED NTST KUJAMA OCP 8.5MTY | 4012 | 404.49 | 31/03/2030 | ||
| 169 | Coal | Ministry of Coal | 612816 | ITAPARA OCP | 929 | 68.9 | 31/03/2030 | ||
| 170 | Coal | Ministry of Coal | 613793 | SHYAMSUNDARPUR UG INCLUDING SA | 484 | 60.46 | 31/03/2026 | 31/03/2028 | |
| 171 | Coal | Ministry of Coal | 613794 | PARASEA-BELBAID UG PROJECT | 389 | 132.48 | 31/03/2028 | ||
| 172 | Coal | Ministry of Coal | 613795 | JAMPALI OC RCE [2.0 MTY] | 279 | 210.07 | 31/03/2025 | 30/06/2025 | |
| 173 | Coal | Ministry of Coal | 613798 | AMERA OC RCE [1.0 MTY] | 336 | 88.24 | 31/03/2026 | ||
| 174 | Coal | Ministry of Coal | 613799 | AMGAON OC RCE [1.0 MTY] | 316 | 188.62 | 31/03/2026 | ||
| 175 | Coal | Ministry of Coal | 613800 | JAGANNATHPUR OC RCE PROJECT | 459 | 274.35 | 31/03/2025 | 31/03/2026 | |
| 176 | Coal | Ministry of Coal | 613801 | MAHAMAYA OCP [1.50 MTY] | 410 | 182.83 | 31/03/2026 | ||
| 177 | Coal | Ministry of Coal | 613802 | KANCHAN OC EXP | 371 | 144.61 | 31/03/2026 | ||
| 178 | Coal | Ministry of Coal | 613803 | JHIRIA WEST OCP [1.5 MTY] | 367 | 34.07 | 31/03/2029 | ||
| 179 | Coal | Ministry of Coal | 613804 | RPR TAWA-III UG 0.84 MTY | 314 | 6.84 | 31/03/2027 | ||
| 180 | Coal | Ministry of Coal | 613808 | MURAIDIH UG PROJECT | 340 | 191 | 30/04/2014 | 31/12/2026 | |
| 181 | Coal | Ministry of Coal | 615183 | KHADIA EXPANSION [10 TO 16 MTP | 492 | 243.56 | 31/03/2025 | 31/03/2027 | |
| 182 | Coal | Ministry of Coal | 615184 | SAONER UG MINE -1 EXPANSION 1. | 229 | 143.37 | 31/03/2028 | ||
| 183 | Coal | Ministry of Coal | 615185 | AMALGAMATED DHANKASA & JAMUNIA | 399 | 93.52 | 31/03/2027 | ||
| 184 | Coal | Ministry of Coal | 615186 | SASTI EXPANSION OPENCAST | 319 | 91.48 | 31/03/2026 | ||
| 185 | Coal | Ministry of Coal | 615187 | RPR OF VISHNUPURI UG TO OC | 221 | 31/03/2029 | |||
| 186 | Coal | Ministry of Coal | 615188 | NEW MAJRI UG TO OC 3 MTY COST | 402 | 60.03 | 31/03/2027 | ||
| 187 | Coal | Ministry of Coal | 615189 | MAKARDHOKRA EXPN OC 4.9 MTY | 362 | 76.32 | 31/03/2026 | ||
| 188 | Coal | Ministry of Coal | 615190 | SINGHORI DEEP OC MIN 2.0 MTY | 336 | 26.98 | 31/03/2029 | ||
| 189 | Coal | Ministry of Coal | 615191 | KATKONA RO UG MINE | 329 | 61.34 | 31/03/2029 | ||
| 190 | Coal | Ministry of Coal | 615192 | GOKUL EXTENSION OC MINE | 310 | 43.88 | 31/03/2026 | ||
| 191 | Coal | Ministry of Coal | 615193 | BASUNDHARA WEST EXTENSION OPEN | 479 | 274.52 | 31/03/2019 | 31/03/2029 | |
| 192 | Coal | Ministry of Coal | 615194 | URDHAN EXPANSION OC COST PLUS | 207 | 27.19 | 31/03/2031 | ||
| 193 | Coal | Ministry of Coal | 615195 | SHARDA UG MINE | 166 | 5.08 | 31/03/2028 | ||
| 194 | Coal | Ministry of Coal | 615199 | KOLGAON EXPANSION DEEP OC MINE | 199 | 0.76 | 31/03/2027 | ||
| 195 | Coal | Ministry of Coal | 615206 | GANDHIGRAM UG MINE | 414 | 15.52 | 31/03/2026 | ||
| 196 | Coal | Ministry of Coal | 615330 | BALLARPUR NORTH WEST OC MINE | 361 | 0.02 | 31/03/2029 | ||
| 197 | Coal | Ministry of Coal | 615331 | GADEGAON OC 3 MTY | 497 | 0.08 | 31/03/2030 | ||
| 198 | Coal | Ministry of Coal | 615349 | TAPIN SOUTH EXPN | 230 | 22.02 | 31/03/2028 | ||
| 199 | Coal | Ministry of Coal | 615818 | Jawahar Khani Open Cast Mine | 298 | 46.83 | 31/03/2025 | 31/03/2027 | |
| 200 | Coal | Ministry of Coal | 615820 | TIKAK EXTENSION OCP | 160 | 81.47 | 04/07/2031 | ||
| 201 | Coal | Ministry of Coal | 615821 | TIRAP OCP | 289 | 105.6 | 27/11/2030 | ||
| 202 | Coal | Ministry of Coal | 615822 | SIRKA OC | 223 | 140.58 | 31/03/2028 | ||
| 203 | Coal | Ministry of Coal | 615843 | TETARIAKHAR OC | 244 | 44.64 | 31/03/2025 | 31/03/2027 | |
| 204 | Coal | Ministry of Coal | 615857 | Naini Coal Mine | 494 | 491.33 | 31/03/2026 | ||
| 205 | Coal | Ministry of Coal | 615858 | Kalyanikhani Opencast Project | 384 | 283.94 | 31/03/2026 | ||
| 206 | Coal | Ministry of Coal | 615859 | Kakathiya Khani Opencast - III Project Phase - I | 414 | 397.55 | 31/03/2026 | ||
| 207 | Coal | Ministry of Coal | 615860 | Godavarikhani Coal Mine - 5 | 607 | 191.37 | 31/03/2025 | 31/03/2026 | |
| 208 | Coal | Ministry of Coal | 615861 | Indaram Opencast Project | 425 | 404.96 | 31/03/2025 | 31/03/2026 | |
| 209 | Coal | Ministry of Coal | 615862 | Goleti Opencast Mine | 346 | 76.19 | 31/03/2026 | ||
| 210 | Coal | Ministry of Coal | 615863 | Venkatesh Khani Coal Mine | 484 | 477.14 | 31/03/2026 | ||
| 211 | Coal | Ministry of Coal | 615864 | Ramagundam OC-II Extension Project | 490 | 405.54 | 31/03/2026 | ||
| 212 | Coal | Ministry of Coal | 615865 | Kakatiyakhani OC - 2 Project | 442 | 230.28 | 31/03/2025 | 31/03/2026 | |
| 213 | Coal | Ministry of Coal | 615914 | GHONSA EXPANSION DEEP OC MINE | 185 | 14.48 | 31/03/2029 | ||
| 214 | Coal | Ministry of Coal | 615916 | AMLG GAURI PAUNI EXPANSION OC | 1225 | 79.73 | 31/03/2030 | ||
| 215 | Coal | Ministry of Coal | 615917 | GAURIDEEP/GAURI CENTRAL OCP 7. | 973 | 0.24 | 31/03/2030 | ||
| 216 | Coal | Ministry of Coal | 615918 | RPR OF BHANEGAON OC | 405 | 12.39 | 31/03/2028 | ||
| 217 | Coal | Ministry of Coal | 615919 | N. EXTN. MUNGOLI NIRGUDA D OCP | 1025 | 170.94 | 31/03/2029 | ||
| 218 | Coal | Ministry of Coal | 615982 | NILJAI EXPANSION DEEP OCP | 320 | 367.6 | 31/03/2024 | 31/03/2026 | |
| 219 | Coal | Ministry of Coal | 616044 | UKNI DEEP OC MINE -COST PLUS | 237 | 165.57 | 31/03/2021 | 31/03/2026 | |
| 220 | Coal | Ministry of Coal | 616050 | AMALGAMATED INDER-KAMPTEE DEEP OC | 236 | 237.12 | 31/03/2024 | 31/03/2026 | |
| 221 | Coal | Ministry of Coal | 616223 | ADASA UG TO OC MINE | 316 | 308.84 | 31/03/2024 | 31/03/2026 | |
| 222 | Coal | Ministry of Coal | 616225 | CHUPERBHITA SIMLONG OCP MDO 6 | 979 | 31/03/2037 | |||
| 223 | Coal | Ministry of Coal | 616226 | INTEGRATED KULDA GARJANBAHAL O | 3564 | 568.97 | 31/03/2033 | ||
| 224 | Coal | Ministry of Coal | 616229 | AMAL GONDEGAON GHATROHANA EXPN | 669 | 1.18 | 31/03/2029 | ||
| 225 | Coal | Ministry of Coal | 616230 | PARASCOLE JAMBAD OCP | 1194 | 9.53 | 31/03/2037 | ||
| 226 | Coal | Ministry of Coal | 616231 | BHUBANESWARI EXPN OCP 50 MTY | 5366 | 466.28 | 31/03/2033 | ||
| 227 | Coal | Ministry of Coal | 616232 | HINGULA II OC EXPN PH III 15 M | 1562 | 273.03 | 31/03/2029 | ||
| 228 | Coal | Ministry of Coal | 616233 | BALABHADRA OCP | 978 | 212.94 | 31/03/2030 | ||
| 229 | Coal | Ministry of Coal | 616234 | PELMA OC MDO | 1725 | 15.66 | 31/03/2033 | ||
| 230 | Coal | Ministry of Coal | 616236 | JARANGDIH EXPN. OCP 1.5 MTY | 414 | 85.6 | 31/03/2029 | ||
| 231 | Coal | Ministry of Coal | 616253 | BLOCK E OCP | 5851 | 20.32 | 31/03/2029 | ||
| 232 | Coal | Ministry of Coal | 617233 | WAGHODA UG MINE [1.02 MTY] | 379 | 31/03/2030 | |||
| 233 | Coal | Ministry of Coal | 617278 | KOLARPIMPRI EXPANSION OC [2.5 | 630 | 31/03/2030 | |||
| 234 | Coal | Ministry of Coal | 617287 | KUSMUNDA OC EXPANSION PROJECT | 4517 | 775.13 | 31/03/2030 | ||
| 235 | Coal | Ministry of Coal | 617288 | MANIKPUR OC EXPANSION PROJECT | 383 | 113.03 | 31/03/2029 | ||
| 236 | Coal | Ministry of Coal | 617416 | Revised Jharia Master Plan for Dealing with Fire, Subsidence & Rehabilitation of affected families in Jharia Coalfield- Reg. | 5940 | 31/12/2028 | |||
| 237 | Electricity Generation | Ministry of Coal | 400231 | NLC Talabira Thermal Power Project | 27213 | 2549.31 | 31/03/2030 | ||
| 238 | Electricity Generation | Ministry of Coal | 400259 | Ghatampur Thermal Power Plant 3 X 660 MW | 17238 | 21780.9 | 20522.3 | 26/11/2020 | 31/12/2025 |
| 239 | Electricity Generation | Ministry of Coal | 612819 | 300 MW SPP part of 510 MW CPSU scheme | 1813 | 1813 | 1167.4 | 27/09/2024 | 31/12/2025 |
| 240 | Electricity Generation | Ministry of Coal | 615327 | 50 MW Solar PP Minedout Area | 218 | 164.7 | 31/03/2025 | 31/12/2025 | |
| 241 | Electricity Generation | Ministry of Coal | 617299 | 50 MW Wind Power Project | 384 | 314.83 | 30/06/2025 | 31/01/2026 | |
| 242 | Electricity Generation | Ministry of Coal | 617730 | 600 MW Khavda Solar Power Project | 3336 | 666.65 | 30/06/2026 | ||
| 243 | Railways | Ministry of Coal | 400203 | Dharamjaigarh-Korba | 1686 | 353.12 | 31/12/2026 | 31/08/2026 | |
| 244 | Railways | Ministry of Coal | 400416 | Shivpur-Kathautia New Rail [BG] Line [49 km] [Package II of Tori-Shivpur-Kathautia line] | 1800 | 2564.34 | 1462.35 | 30/06/2025 | 30/06/2026 |
| 245 | Healthcare | Ministry of Health & Family Welfare | 701167 | AIIMS Kashmir at Awantipora Jammu & Kashmir | 1828 | 1828 | 1321.7 | 31/01/2025 | 02/12/2025 |
| 246 | Healthcare | Ministry of Health & Family Welfare | 701171 | AIIMS Bibinagar | 1028 | 1365.95 | 806.8 | 30/09/2022 | 31/12/2025 |
| 247 | Healthcare | Ministry of Health & Family Welfare | 701173 | AIIMS Majra Rewari Haryana | 1299 | 349.41 | 27/02/2023 | 31/12/2026 | |
| 248 | Construction | Ministry of Housing & Urban Affairs | 617282 | C/o 184 MS Flats for Hon'ble MPs at BKS Marg, New Delhi | 647 | 646.52 | 545.86 | 20/05/2025 | 30/09/2025 |
| 249 | Construction | Ministry of Housing & Urban Affairs | 617412 | Construction of One Tower of Office Complex and another Tower of Residential quarters consisting of 10Nos. Type-V, 10Nos. Type-VI & 1No.Type-VII Quarters i/c internal water supply, sanitary installation and all development and bulk services, Horticulture works on EPC Mode-I basis i/c comprehensive operation and maintenance of Civil, E&M services for 7 years after completion of original construction work for Ranga Reddy, Secunderabad, Medchal, AuditI, Audit-II Commissionerates of Central Tax at Khajaguda, Serilingampally, Hyderabad. | 644 | 87.6 | 27/09/2027 | ||
| 250 | Inland Waterways | Ministry of Housing & Urban Affairs | 702668 | Chennai Metro Rail Phase-II Development Project | 63246 | 28779 | 31/08/2029 | ||
| 251 | Real Estate | Ministry of Housing & Urban Affairs | 400188 | Redevelopment of Seven General Pool Residential Accommodation [GPRA] Colonies in Delhi | 32850 | 0 | 31/12/2025 | 31/12/2025 | |
| 252 | Real Estate | Ministry of Housing & Urban Affairs | 701719 | Rehablitation in Junavadaj Area Smart City Project | 539 | 39.63 | 07/07/2022 | ||
| 253 | Real Estate | Ministry of Housing & Urban Affairs | 701766 | Green Building Development Project | 151 | 18.95 | 23/11/2023 | ||
| 254 | Real Estate | Ministry of Housing & Urban Affairs | 707229 | Integrated Command control Center [ICCC] - Construction and Development of Integrated Command Control Center with Security, Surveillance, ITMS, Connecting Port, Ship Service, Smart Solid Waste Management, Smart Public Transport System | 210 | 31/05/2023 | |||
| 255 | Urban Public Transport | Ministry of Housing & Urban Affairs | 617206 | Delhi Metro Rail Phase-IV [Rithala - Kundli Corridor] | 6231 | 72.38 | 02/01/2029 | ||
| 256 | Urban Public Transport | Ministry of Housing & Urban Affairs | 617207 | Delhi Metro Rail Phase-IV [2 Corridors] | 8400 | 55.92 | 27/03/2029 | ||
| 257 | Urban Public Transport | Ministry of Housing & Urban Affairs | 617225 | PCMC To Nigdi- Extension Of North South Corridor Of Phase-1 | 910 | 147.84 | 31/01/2027 | ||
| 258 | Urban Public Transport | Ministry of Housing & Urban Affairs | 617226 | Pune Metro Phase-1 Extension line towards south from Swargate to Katraj | 2955 | 22.17 | 04/03/2029 | ||
| 259 | Urban Public Transport | Ministry of Housing & Urban Affairs | 617327 | Thane Integral Ring Metro Rail Project | 12200 | 7.77 | 30/09/2029 | ||
| 260 | Urban Public Transport | Ministry of Housing & Urban Affairs | 701745 | New Suburba Station Development Project | 263 | 17.62 | 31/07/2022 | ||
| 261 | Urban Public Transport | Ministry of Housing & Urban Affairs | 701991 | Kalyan Station Precinct Imporvement Project | 600 | 272.42 | 31/07/2023 | ||
| 262 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702625 | Bhopal Metro Rail Project | 6941 | 3676.19 | 29/11/2022 | 30/06/2028 | |
| 263 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702626 | Indore Metro Rail Project | 7501 | 4223.43 | 29/11/2022 | 31/12/2028 | |
| 264 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702627 | Patna Metro Rail Project | 13366 | 13365.8 | 4039.77 | 26/02/2024 | 30/06/2027 |
| 265 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702628 | Kanpur Metro Rail Project | 11076 | 9093.83 | 26/05/2024 | 31/03/2027 | |
| 266 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702629 | Agra Metro Rail Project | 8380 | 6067.88 | 26/05/2024 | 30/06/2027 | |
| 267 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702630 | Surat Metro Rail Project | 12020 | 7977.03 | 31/03/2024 | 30/06/2026 | |
| 268 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702631 | Ahmedabad Metro Rail Project, Phase-II | 5384 | 4308.13 | 31/03/2024 | 31/12/2025 | |
| 269 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702632 | DMRTS Phase - IV [3 Priority Corridors] | 24949 | 17838.2 | 31/03/2025 | 31/03/2026 | |
| 270 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702633 | Delhi-Ghaziabad-Meerut Regional Rapid Transit System [RRTS] corridor | 30274 | 30274 | 26612.5 | 30/06/2025 | 15/10/2025 |
| 271 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702635 | Construction of Bangalore Metro Rail Project Phase 2. | 26405 | 30695.1 | 29618 | 22/03/2021 | 30/09/2026 |
| 272 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702637 | Mumbai Metro Line 3 | 23136 | 37276 | 31783.9 | 31/03/2023 | 31/08/2025 |
| 273 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702639 | Ahmedabad Metro Rail Project [Phase-I] | 10773 | 12924.5 | 12212.9 | 31/03/2018 | 31/10/2025 |
| 274 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702658 | Nagpur Metro Rail Phase II Development Project | 6708 | 1259.29 | 31/12/2027 | ||
| 275 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702664 | Kochi Metro Rail Phase 2 Development Project | 1957 | 425.58 | 20/11/2026 | 20/11/2026 | |
| 276 | Urban Public Transport | Ministry of Housing & Urban Affairs | 702665 | Construction Bangalore Metro Rail Project Phase-2A & 2B | 14788 | 14788.1 | 8915.63 | 30/06/2026 | 30/06/2026 |
| 277 | Waste & Water | Ministry of Housing & Urban Affairs | 702355 | Storm water drainag Development Project | 210 | 20/03/2024 | |||
| 278 | Waste & Water | Ministry of Housing & Urban Affairs | 702674 | ESR - 8 nos., distribution system - 216 Km, new house service connections - 38760 nos. upgrading of feeder mains, pumping station etc. - Phase II | 172 | 799.74 | 31/03/2023 | 31/12/2025 | |
| 279 | Waste & Water | Ministry of Housing & Urban Affairs | 702682 | Dibrugarh Water Supply Infrastructure Project | 187 | 1664.41 | 31/03/2023 | 30/12/2025 | |
| 280 | Waste & Water | Ministry of Housing & Urban Affairs | 702699 | Muzaffarpur Storm Water Drainage Phase-I Project | 159 | 602.5 | 31/10/2023 | 31/12/2025 | |
| 281 | Waste & Water | Ministry of Housing & Urban Affairs | 702734 | Sewerage Management Scheme Part-3 Implementation | 278 | 2005.13 | 30/09/2023 | 30/03/2026 | |
| 282 | Waste & Water | Ministry of Housing & Urban Affairs | 702735 | Sewerage Management Scheme Part-3 Implementation | 213 | 1430.38 | 31/03/2023 | 30/12/2025 | |
| 283 | Waste & Water | Ministry of Housing & Urban Affairs | 702741 | Dhanbad Water Supply Infrastructure Project | 217 | 1057.8 | 31/03/2023 | 30/03/2026 | |
| 284 | Waste & Water | Ministry of Housing & Urban Affairs | 702742 | SAAP-3 Water Supply Infrastructure SAAP-3 Project | 159 | 787.5 | 31/10/2023 | 30/03/2026 | |
| 285 | Waste & Water | Ministry of Housing & Urban Affairs | 702746 | Augmentation and Strenghthning of Urban Water Supply Phase 1 - SAAP 3 | 278 | 1410 | 31/03/2023 | 30/03/2026 | |
| 286 | Waste & Water | Ministry of Housing & Urban Affairs | 702760 | Belgavi Improvement in Sewerage System Project | 163 | 721.71 | 31/07/2023 | 31/12/2025 | |
| 287 | Waste & Water | Ministry of Housing & Urban Affairs | 702764 | 24/7 water supply under AMRUT for Davanagere | 175 | 923.02 | 31/03/2023 | 31/12/2025 | |
| 288 | Waste & Water | Ministry of Housing & Urban Affairs | 702793 | Indore Water Supply Infrastructure Project | 287 | 2271 | 31/03/2023 | 31/12/2025 | |
| 289 | Waste & Water | Ministry of Housing & Urban Affairs | 702798 | Jabalpur Sewerage Management and Treatment Infrastructure Project | 362 | 2930.96 | 31/03/2023 | 31/12/2025 | |
| 290 | Waste & Water | Ministry of Housing & Urban Affairs | 702808 | Satna Sewerage Management and Treatment Infrastructure Project | 192 | 1469.73 | 31/03/2024 | 31/12/2025 | |
| 291 | Waste & Water | Ministry of Housing & Urban Affairs | 702810 | Singrauli Sewerage Management and Treatment Infrastructure Project | 402 | 3175.93 | 31/03/2023 | 31/12/2025 | |
| 292 | Waste & Water | Ministry of Housing & Urban Affairs | 702833 | Kalyan-Dombivali Water Supply Infrastructure Project | 194 | 1055.02 | 31/10/2023 | 31/12/2025 | |
| 293 | Waste & Water | Ministry of Housing & Urban Affairs | 702840 | Mira-Bhayandar Water Supply Infrastructure Project | 205 | 1765.97 | 31/03/2023 | 31/12/2025 | |
| 294 | Waste & Water | Ministry of Housing & Urban Affairs | 702842 | Nagpur Water Supply Infrastructure Project | 274 | 2409.09 | 31/03/2023 | 31/12/2025 | |
| 295 | Waste & Water | Ministry of Housing & Urban Affairs | 702851 | Pune Water Supply Infrastructure Project | 236 | 1901.3 | 31/03/2023 | 31/10/2025 | |
| 296 | Waste & Water | Ministry of Housing & Urban Affairs | 702854 | Solapur Sewerage Management Infrastructure Project | 180 | 1442.29 | 31/03/2023 | 31/12/2025 | |
| 297 | Waste & Water | Ministry of Housing & Urban Affairs | 702948 | Jaunpur Sewerage Management Infrastructure Project | 236 | 1911.66 | 30/06/2023 | 31/12/2025 | |
| 298 | Waste & Water | Ministry of Housing & Urban Affairs | 702949 | Jhansi Water Supply Infrastructure Phase-II Project | 562 | 4045.35 | 31/07/2023 | 31/12/2025 | |
| 299 | Waste & Water | Ministry of Housing & Urban Affairs | 703021 | Jalandhar Water Supply Infrastructure Project | 259 | 1390.73 | 28/08/2023 | 30/03/2026 | |
| 300 | Waste & Water | Ministry of Housing & Urban Affairs | 703057 | Patiala Water Supply Infrastructure Part-2 Project | 287 | 1416.38 | 31/10/2023 | 30/12/2025 | |
| 301 | Waste & Water | Ministry of Housing & Urban Affairs | 707267 | Upgradation of Sewerage system in Gandhinagar City | 200 | 100 | 30/06/2023 | ||
| 302 | Healthcare | Ministry of Labour and Employment | 612167 | Construction of 350 beds + 50 Super Specialty beds ESIC Hospital Sheelanagar, Visakhapatnam, Andhra Pradesh | 384 | 105 | 09/10/2025 | 09/01/2026 | |
| 303 | Healthcare | Ministry of Labour and Employment | 612178 | Construction of 100 Bedded ESIC Hospital building and 32 Nos Residential Quarters at Vallam Vadangal, SIPCOT, Sriperumbudur | 153 | 107.83 | 12/06/2025 | ||
| 304 | Healthcare | Ministry of Labour and Employment | 612185 | C/o Construction of 200 bedded [Up-gradable to 300 bedded] ESI Hospital at Surat Gujarat. | 209 | 180.54 | 03/06/2025 | 30/05/2025 | |
| 305 | Healthcare | Ministry of Labour and Employment | 612186 | 350 Bedded [Upgradable to 500 beds] ESI Hospital at Sanand | 558 | 58.36 | 04/03/2026 | 28/02/2026 | |
| 306 | Healthcare | Ministry of Labour and Employment | 612188 | Construction of 200 Bedded [Upgradable to 500 Bedded including 50 beds of SST] ESIC Hospital at Bibewadi, Pune | 429 | 252.06 | 19/09/2025 | 21/02/2026 | |
| 307 | Healthcare | Ministry of Labour and Employment | 612201 | Construction of 200 bedded ESIC Hospital with 62 Nos Staff quarters , Beltola | 143 | 154.75 | 101.83 | 12/04/2025 | 31/10/2025 |
| 308 | Healthcare | Ministry of Labour and Employment | 612211 | Demolition, Construction and upgradation of ESI Hospital, Kalol, Gujarat from 50 beds to 150 beds. | 206 | 31.49 | 05/10/2025 | 30/06/2026 | |
| 309 | Healthcare | Ministry of Labour and Employment | 612213 | Construction of 200 Bedded ESIC Hospital at Butibori, Nagpur, Maharashtra. | 195 | 196.7 | 86.6 | 31/08/2025 | 31/08/2025 |
| 310 | Healthcare | Ministry of Labour and Employment | 612239 | Construction of 100 bedded ESIC Hospital & 32 nos. of Staff qtrs at OMPURA J&K. | 131 | 164.93 | 1747.76 | 30/09/2024 | 31/05/2025 |
| 311 | Healthcare | Ministry of Labour and Employment | 612259 | CONSTRUCTION OF 300 BEDDED HOSPITAL AT HARIDWAR | 102 | 297.63 | 297.63 | 30/10/2024 | 30/06/2025 |
| 312 | Healthcare | Ministry of Labour and Employment | 612513 | Construction of 100 Bedded ESI Hospital at Duburi, Odisha. | 165 | 16.4 | 09/06/2027 | ||
| 313 | Healthcare | Ministry of Labour and Employment | 612688 | Construction of New OPD Block 200 Bed ward Basement + GF + 6 Floors at the location of old OPD block, at existing ESIC Hospital/ Medical college campus, Sanathnagar, Hyderabad | 211 | 198.95 | 30/06/2024 | 30/06/2025 | |
| 314 | Healthcare | Ministry of Labour and Employment | 612745 | Construction of 200 bed ESI Hospital at Bommasandra, Karnataka | 278 | 27.8 | 12/01/2027 | ||
| 315 | Healthcare | Ministry of Labour and Employment | 612748 | Construction of 100 bed ESI Hospital and Staff Quarters [32 Nos.] at Harohalli, Karnataka | 151 | 0 | 28/02/2027 | ||
| 316 | Healthcare | Ministry of Labour and Employment | 616691 | Upgradation & Extension of ESIC Hospital and Construction of PG Hostel / Staff Housing for ESIC Hospital at Andheri, Mumbai | 260 | 210.12 | 15/08/2025 | 31/12/2025 | |
| 317 | Construction | Ministry of Mines | 617280 | Construction of Basement + Ground Floor+ 10 Storeyed building for State of the Art Director General, GSI Building at plot No.GN-40, Sector-V, Salt Lake, Kolkata | 255 | 85.9 | 31/08/2026 | ||
| 318 | Metals & Mining | Ministry of Mines | 400141 | Expansion of Alumina Refinery Plant with addition of 5th Stream having capacity enhancement of 1.0 Million Tonee Per Annum | 4103 | 5677.4 | 4196.32 | 31/12/2022 | 30/09/2025 |
| 319 | Metals & Mining | Ministry of Mines | 400299 | Pottangi Bauxite Mines Project | 1381 | 1960.77 | 650.04 | 31/03/2025 | 31/05/2026 |
| 320 | Metals & Mining | Ministry of Mines | 400426 | Expansion of Malanjkhand Copper Project | 1856 | 940.27 | 30/04/2020 | 30/04/2026 | |
| 321 | Metals & Mining | Ministry of Mines | 611798 | Rakha Underground Mining Project | 2705 | 31/03/2033 | |||
| 322 | Metals & Mining | Ministry of Mines | 611800 | Surda Underground Copper Mining Project | 665 | 23.43 | 31/03/2028 | ||
| 323 | Metals & Mining | Ministry of Mines | 709829 | UTKAL D AND E COAL BLOCK | 1022 | 0 | 31/03/2025 | ||
| 324 | Metals & Mining | Ministry of Mines | 709830 | CONVERSION OF FLAT BOTTOM SETTLERS AND WASHERS WITH A SINGLE TRAIN OF HRDS AND DCWS IN STREAMS 1 AND | 355 | 581 | 0 | 30/11/2026 | |
| 325 | Metals & Mining | Ministry of Mines | 709831 | SOURCING OF BAUXITE ARRANGEMENT FOR 5TH STREAM ALUMINA REFINERY FROM SOUTH BLOCK MINING LEASE OF PANCHPATMAILI MINES | 483 | 411.79 | 31/05/2025 | 30/06/2026 | |
| 326 | Metals & Mining | Ministry of Mines | 709832 | 25.5 MW WIND POWER PROJECT AT KAYATHAR IN TAMILNADU | 166 | 135 | 31/03/2025 | 31/03/2026 | |
| 327 | Energy Storage | Ministry of Petroleum & Natural Gas | 400012 | Kandla Gorakhpur LPG Pipeline | 10088 | 10088 | 8059.53 | 30/12/2021 | 31/12/2025 |
| 328 | Energy Storage | Ministry of Petroleum & Natural Gas | 400035 | Grass Root Rail-fed Depot at Sekerkote, Agartala as resitement of existing Dharmanagar Depot | 656 | 656 | 509.92 | 30/09/2025 | 30/06/2026 |
| 329 | Energy Storage | Ministry of Petroleum & Natural Gas | 400043 | Laying of POL Pipelines in Common Corridor for proposed grass root terminal at Vallur [Chennai] | 829 | 829 | 327.86 | 31/05/2026 | 31/05/2026 |
| 330 | Energy Storage | Ministry of Petroleum & Natural Gas | 400077 | Grass root POL Terminal at Vallur, Chennai | 827 | 887.71 | 638.71 | 31/12/2024 | 31/03/2026 |
| 331 | Energy Storage | Ministry of Petroleum & Natural Gas | 400078 | New Mundra Panipat Crude Oil Pipeline | 9028 | 9028 | 7292.34 | 19/12/2024 | 31/12/2025 |
| 332 | Energy Storage | Ministry of Petroleum & Natural Gas | 400235 | Setting up a common user Petroleum Terminal at Jammu, J&K for resitement of existing PSU OMC's Depots from Jammu City | 677 | 715.89 | 550.45 | 31/03/2025 | 31/01/2026 |
| 333 | Energy Storage | Ministry of Petroleum & Natural Gas | 400301 | Multi Product Pipeline from Irugur to Devangonthi | 678 | 1732 | 800.88 | 25/02/2017 | 30/09/2026 |
| 334 | Energy Storage | Ministry of Petroleum & Natural Gas | 604833 | Andheri Residential Towers, Mumbai | 281 | 389.67 | 238.39 | 31/05/2025 | 30/06/2026 |
| 335 | Energy Storage | Ministry of Petroleum & Natural Gas | 604852 | Grass-root Terminal at Mirzapur, Uttar Pradesh | 980 | 980.45 | 227.04 | 30/11/2026 | 30/11/2026 |
| 336 | Energy Storage | Ministry of Petroleum & Natural Gas | 616235 | Construction of Aviation Fuel farm Facilities at Bhogapuram Airport | 240 | 240 | 61.94 | 31/03/2026 | 31/03/2026 |
| 337 | Energy Storage | Ministry of Petroleum & Natural Gas | 701263 | Rajasthan Refinery Project | 43129 | 79459 | 61926.6 | 31/10/2022 | 31/03/2026 |
| 338 | Energy Storage | Ministry of Petroleum & Natural Gas | 701343 | Srikakulam Angul Gas Pipeline Project | 2658 | 2810 | 2282.98 | 22/07/2022 | 31/12/2025 |
| 339 | Energy Storage | Ministry of Petroleum & Natural Gas | 701349 | Paradip-Numaligarh Crude Oil Pipeline [PNCPL] & Crude Oil Import Terminal [COIT] at Paradip | 10228 | 11407 | 9921.29 | 27/07/2024 | 31/03/2026 |
| 340 | Energy Storage | Ministry of Petroleum & Natural Gas | 709754 | Construction of LPG Facilities at Kamardanga, Assam | 156 | 156.36 | 63.31 | 04/07/2027 | 04/07/2027 |
| 341 | Energy Storage | Ministry of Petroleum & Natural Gas | 709755 | Setting up of new rail fed POL facility at Kamardanga, Assam | 384 | 384.04 | 142.28 | 04/07/2027 | 04/07/2027 |
| 342 | Energy Storage | Ministry of Petroleum & Natural Gas | 709759 | Petrochemical evacuation marketing terminal at Barmer, Rajasthan | 461 | 461.05 | 145.12 | 06/12/2026 | 06/12/2026 |
| 343 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400087 | Redevelopment of Sobhasan Complex | 886 | 1286.67 | 876.53 | 28/02/2026 | 28/02/2026 |
| 344 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400119 | Life Extension of 48 well platforms of Mumbai High & Heera Fields | 3191 | 3375.9 | 3119.29 | 30/04/2018 | 31/12/2025 |
| 345 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400120 | KG-DWN-98/2 Cluster - II Development Project - NELP Block | 34012 | 34012 | 32184 | 30/06/2020 | 30/06/2026 |
| 346 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400158 | Debottlenecking and Augmentation of Cryogenic facilities at Uran LPG Import Terminal | 1165 | 1629.86 | 958.12 | 29/02/2024 | 31/12/2025 |
| 347 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400161 | PP Project, Pata | 911 | 1299.02 | 1041 | 31/01/2024 | 30/11/2025 |
| 348 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400167 | Redevelopment of Santhal Field [Onshore-Mehsana Asset] | 1163 | 1162.56 | 1139.5 | 31/03/2026 | 31/03/2026 |
| 349 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400168 | 500 KTA PDHPP Project, Usar | 8797 | 11256 | 7122.88 | 08/04/2025 | 31/12/2025 |
| 350 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400169 | Redevelopment of Linch Field | 631 | 860.04 | 572.74 | 31/03/2025 | 31/03/2026 |
| 351 | Oil & Gas | Ministry of Petroleum & Natural Gas | 400171 | 2G Ethanol Biorefinery at Bathinda | 1421 | 1421.46 | 1201.66 | 18/02/2023 | 31/03/2026 |
| 352 | Oil & Gas | Ministry of Petroleum & Natural Gas | 604791 | Numaligarh Refinery Expansion Project | 12366 | 22494 | 17659.1 | 27/07/2024 | 31/12/2025 |
| 353 | Oil & Gas | Ministry of Petroleum & Natural Gas | 604795 | CBR 9 MMTPA Project | 31580 | 36354 | 1342.27 | 02/06/2025 | 31/10/2028 |
| 354 | Oil & Gas | Ministry of Petroleum & Natural Gas | 604853 | Indian Oil Technology Development and Deployment Centre at R&D Campus-II, Faridabad | 2282 | 3200 | 1841.09 | 31/12/2022 | 31/10/2026 |
| 355 | Oil & Gas | Ministry of Petroleum & Natural Gas | 604859 | Integrated Para Xylene [PX] and Purified Terephthalic Acid [PTA] Project at Paradip Refinery | 13805 | 11783 | 8422.69 | 31/01/2024 | 31/08/2026 |
| 356 | Oil & Gas | Ministry of Petroleum & Natural Gas | 604863 | Development of Surface Facilities for production and evacuation of Crude Oil and Natural Gas from Nadua and East Khagorija | 683 | 726.93 | 491.64 | 29/02/2020 | 31/12/2025 |
| 357 | Oil & Gas | Ministry of Petroleum & Natural Gas | 607701 | Guwahati Refinery Expansion [1.0 to 1.2 MMTPA] along with installation of CRU, Guwahati Refinery | 412 | 577 | 445.73 | 31/10/2023 | 31/05/2026 |
| 358 | Oil & Gas | Ministry of Petroleum & Natural Gas | 610984 | Development of Jharia CBM Block [Phase-1] | 431 | 431 | 223.39 | 21/01/2024 | 31/01/2026 |
| 359 | Oil & Gas | Ministry of Petroleum & Natural Gas | 610985 | Construction of lube oil blending plant at Rasayani | 423 | 526.26 | 313 | 31/12/2023 | 31/12/2025 |
| 360 | Oil & Gas | Ministry of Petroleum & Natural Gas | 611917 | Poly Butadiene Rubber plant at Panipat | 1459 | 2531.44 | 1381.16 | 31/03/2025 | 30/06/2026 |
| 361 | Oil & Gas | Ministry of Petroleum & Natural Gas | 612790 | Power System Upgradation Project | 385 | 385 | 155.14 | 17/11/2025 | 12/05/2026 |
| 362 | Oil & Gas | Ministry of Petroleum & Natural Gas | 612853 | Gurdaspur Jammu Pipeline | 522 | 521.9 | 230.2 | 11/07/2026 | 11/07/2026 |
| 363 | Oil & Gas | Ministry of Petroleum & Natural Gas | 616254 | Visakh Raipur Pipeline Project | 2212 | 2212 | 21.1 | 10/09/2027 | 10/09/2027 |
| 364 | Oil & Gas | Ministry of Petroleum & Natural Gas | 616858 | Construction of Field Gas Gathering Station at Baghjan area for collection, processing & transportation of natural Gas to be produced from Baghjan Field | 431 | 430.76 | 330.99 | 31/03/2024 | 31/12/2025 |
| 365 | Oil & Gas | Ministry of Petroleum & Natural Gas | 616879 | Demo Bio-ATF Project | 364 | 364 | 32.59 | 16/01/2027 | 16/01/2027 |
| 366 | Oil & Gas | Ministry of Petroleum & Natural Gas | 616933 | Lube Modernization & Bottom Upgradation Project at Mumbai Refinery | 4679 | 4679 | 211.77 | 16/03/2028 | 16/03/2028 |
| 367 | Oil & Gas | Ministry of Petroleum & Natural Gas | 616950 | PRP-VIII [Group-A] | 1486 | 1486.4 | 272.3 | 28/02/2026 | 28/02/2026 |
| 368 | Oil & Gas | Ministry of Petroleum & Natural Gas | 617302 | Durgapur - Haldia Pipeline [Section-3B of JHBDPL Project] | 1740 | 2493.15 | 2285 | 31/12/2020 | 31/12/2025 |
| 369 | Oil & Gas | Ministry of Petroleum & Natural Gas | 617304 | Setting up of LPG Plant with Rail Unloading Facility at Hathua, Dist. Gopalganj, Bihar | 340 | 340.15 | 107.35 | 01/03/2027 | 01/03/2027 |
| 370 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701228 | Kochi - Koottanad - Bangalore - Mangalore Pipeline Phase-II | 2915 | 5909 | 4506.79 | 31/12/2012 | 31/12/2025 |
| 371 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701289 | Capacity Expansion of Panipat Refinery from 15 to 25 MMTPA | 34627 | 36225 | 26555.1 | 30/09/2024 | 30/06/2026 |
| 372 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701324 | Barauni Refinery Capacity Expansion from 6.0 to 9.0 MMTPA | 14810 | 16724 | 12139 | 30/04/2023 | 31/08/2026 |
| 373 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701329 | Petrochemical and Lube Integration Project at Gujarat Refinery | 18936 | 17825 | 12779.6 | 31/08/2024 | 30/06/2026 |
| 374 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701330 | Mehsana-Bhatinda & Bhatinda-Jammu Natural Gas Pipeline | 7392 | 7392 | 6308 | 30/06/2024 | 31/12/2025 |
| 375 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701338 | City Gas Distribution Maharashtra Natural Gas Limited | 5535 | 5535 | 3986.49 | 08/06/2031 | 08/06/2031 |
| 376 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701344 | Dhamra Haldia Pipeline Project | 1031 | 1125 | 879.8 | 07/11/2022 | 31/12/2025 |
| 377 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701346 | North East Gas Grid | 9265 | 9265 | 6603.95 | 31/03/2024 | 31/03/2026 |
| 378 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701350 | Upgradation of Facilities of Numaligarh-Siliguri Product Pipeline [NSPL] for transportation of additional products from existing 1.72 MMTPA to 5.5 MMTPA | 860 | 860 | 615.47 | 20/12/2024 | 31/12/2025 |
| 379 | Oil & Gas | Ministry of Petroleum & Natural Gas | 701354 | Mumbai Nagpur Jharsuguda Pipeline Project | 7844 | 8255 | 6661.2 | 14/05/2023 | 31/12/2025 |
| 380 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709750 | Laying of new 28 inch Desal Water Pipeline and 10 inch Reject Water Pipeline between CPCL Manali Refinery and CPCL Desalination plant at Ennore | 205 | 205 | 56.22 | 21/09/2025 | 31/12/2025 |
| 381 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709752 | HP-COAT [Crude to Olefins and Aromatics Technology] demo unit at Visakh Refinery | 160 | 220 | 92.6 | 30/06/2024 | 31/03/2026 |
| 382 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709753 | Haldia Panagarh Pipeline Project | 1010 | 1010 | 692.62 | 08/11/2025 | 08/05/2026 |
| 383 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709757 | CGD Project in Banka, Dumka, Godda, Jamtara, Pakur, Sahibganj GA ID 11A.02 | 1377 | 1377 | 345.02 | 30/06/2030 | 30/06/2030 |
| 384 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709758 | CGD Project in Malda, Birbhum, Murshidabad, Dakshin Dinajpur GA ID 11A.03 | 2628 | 2628 | 348.91 | 30/06/2030 | 30/06/2030 |
| 385 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709760 | HP TDAE Unit in Mumbai Refinery | 240 | 240 | 44.87 | 19/04/2026 | 19/04/2026 |
| 386 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709766 | City Gas Distribution Project at Kurnool, Guntur & Prakasam Districts | 1420 | 1420 | 167.02 | 31/03/2030 | 31/03/2030 |
| 387 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709770 | City Gas Distribution Project at Pathankot District | 151 | 151 | 8.75 | 30/09/2033 | 30/09/2033 |
| 388 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709771 | City Gas Distribution Project at Beed, Jalgaon and Jalna Districts | 865 | 865 | 71.43 | 30/09/2031 | 30/09/2031 |
| 389 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709772 | City Gas Distribution Project at East Mednipore, West Mednipore & Jhargram Districts | 609 | 609 | 58.09 | 30/06/2031 | 30/06/2031 |
| 390 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709773 | City Gas Distribution Project at Jammu, Udhampur, Reasi, Samba and Kathua Districts | 538 | 538 | 4.1 | 31/03/2032 | 31/03/2032 |
| 391 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709774 | Revamping/ Augmentation of facilities at existing port terminal at Mangalore | 463 | 500.62 | 285.36 | 31/12/2025 | 31/12/2025 |
| 392 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709776 | Augmentation/Revamping of Facilities at existing Guwahati Terminal at Betkuchi | 277 | 323.09 | 188.04 | 30/09/2026 | 30/09/2026 |
| 393 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709777 | Installation of Bitumen Manufacturing Unit along with allied facilities at Barauni Refinery | 389 | 340 | 73.97 | 30/04/2025 | 31/10/2026 |
| 394 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709778 | Installation of new Biturox Unit along with allied facilities at Gujarat Refinery | 328 | 287 | 172.32 | 08/08/2025 | 30/09/2026 |
| 395 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709779 | Capacity Expansion of Digboi Refinery from 0.65 to 1.0 MMTPA | 768 | 740 | 123.97 | 08/03/2026 | 31/07/2027 |
| 396 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709780 | Construction of Additional Tankages and Allied Facilities at JNPT Terminal | 341 | 436.14 | 289.06 | 31/08/2026 | 31/08/2026 |
| 397 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709781 | Revamping / Augmentation of Facilities at Mathura Bitumen Plant | 260 | 260.12 | 8.14 | 30/06/2027 | 31/12/2026 |
| 398 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709782 | ATF Pipeline from Jawaharlal Nehru Port Trust to Navi Mumbai International Airport | 165 | 165 | 94.21 | 21/08/2025 | 31/03/2026 |
| 399 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709783 | Installation of Multiple Effect Evaporator [MEE] for ETP-1, 2 & 4 of Panipat Refinery and Petrochemical Complex. | 165 | 247.69 | 138.41 | 30/06/2023 | 30/06/2026 |
| 400 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709785 | Laying of Natural Gas Pipeline from Hazaribagh to Ranchi [HRPL] | 202 | 202.07 | 60.23 | 08/02/2026 | 08/02/2026 |
| 401 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709786 | Augmentation/ Revamping of Dimapur Depot, Dimapur | 228 | 227.62 | 10.8 | 30/11/2027 | 30/11/2027 |
| 402 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709789 | Installation of Independent De- Aromatized Solvents [DAS] production facilities at MR | 405 | 343 | 214.5 | 31/07/2025 | 31/12/2025 |
| 403 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709790 | Replacement and Extension of Jetty Pipelines [REJP] at KR | 622 | 621.87 | 203.68 | 31/03/2026 | 31/03/2026 |
| 404 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709791 | City Gas Distribution Projects at Alipurduar and Cooch Behar | 1017 | 1017 | 194.58 | 31/03/2030 | 31/03/2030 |
| 405 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709792 | City Gas Distribution Projects at Darbhanga, Madhubani, Supaul, Sitamarhi and Sheohar districts | 3638 | 3638 | 422.37 | 31/03/2030 | 31/03/2030 |
| 406 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709793 | City Gas Distribution Projects at Gopalganj, Siwan, West Champaran, East Champaran and Deoria districts | 3919 | 3919 | 421.98 | 30/06/2030 | 30/06/2030 |
| 407 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709794 | City Gas Distribution Projects at Fazilka [except area already authorized], Ganganagar and Hanumangarh districts | 3207 | 3207 | 348.41 | 30/06/2030 | 30/06/2030 |
| 408 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709795 | City Gas Distribution Projects at Lakhimpur Kheri , Sitapur, Bahraich, Shravasti,Balrampur, Siddharth Nagar & Maharajganj districts | 16654 | 16654 | 595.93 | 30/06/2030 | 30/06/2030 |
| 409 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709796 | City Gas Distribution Projects at the Nilgiris and Erode districts | 3685 | 3685 | 244.45 | 31/03/2030 | 31/03/2030 |
| 410 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709797 | POL & LOBS Installations with Receipt Pipelines at Rasayani | 2585 | 2585 | 711.91 | 31/05/2026 | 31/05/2026 |
| 411 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709798 | Ethylene Cracker Project at Bina Refinery including downstream Petrochemical Plants and expansion of Refinery | 43367 | 43367 | 1955 | 31/05/2028 | 31/05/2028 |
| 412 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709799 | Setting up Polypropylene Unit at Kochi Refinery | 4460 | 4460 | 308.59 | 31/10/2027 | 31/10/2027 |
| 413 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709800 | CUF POL Depot at Sadashibpur [Meramundali], Odisha | 394 | 393.54 | 110.87 | 31/03/2026 | 31/03/2026 |
| 414 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709837 | Creation of Gas Dehydration Facilities, Tripura Asset | 209 | 131.51 | 70.1 | 31/05/2024 | 31/12/2025 |
| 415 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709838 | Commercial Polymer Flooding Project in Bechraji field | 621 | 739.02 | 137.73 | 30/11/2024 | 31/05/2027 |
| 416 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709839 | Daman Upside Development Project | 4144 | 6406.9 | 4563.85 | 31/10/2025 | 28/02/2026 |
| 417 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709840 | Restoration of Gas Terminal, Phase-I [Part-A], Hazira | 249 | 249.43 | 210.42 | 10/02/2025 | 31/12/2025 |
| 418 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709841 | Old Pipe Line Replacement [OPRP] Group-A | 173 | 169.84 | 152.39 | 18/07/2025 | 17/03/2026 |
| 419 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709842 | Kalol Redevelopment Project, Ahmedabad Asset | 1487 | 1487.41 | 937.5 | 31/03/2027 | 31/03/2027 |
| 420 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709845 | Revamping of SV Stations, Gas Terminal & Kribhco Terminal | 837 | 837.34 | 288.4 | 31/08/2026 | 31/08/2026 |
| 421 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709846 | Part Replacement Pipeline Project [PRPP] | 1219 | 1145.1 | 745 | 15/05/2024 | 15/12/2025 |
| 422 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709847 | Pipeline Network Project Rudrasagar | 345 | 344.99 | 215.98 | 27/04/2026 | 27/04/2026 |
| 423 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709848 | MHN TCPP PGC BGC Project [MTPBP] | 2329 | 2354.23 | 1148.9 | 19/05/2026 | 19/05/2026 |
| 424 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709849 | PRP-VIII Group B [NH & BS Asset] | 2380 | 3165.53 | 1806.88 | 28/02/2026 | 28/02/2026 |
| 425 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709850 | Borholla GGS Life Extension Project [BLEP] | 199 | 198.7 | 50.26 | 16/05/2026 | 16/05/2026 |
| 426 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709851 | Integrated Development of 4 Contract Areas under DSF-II | 6184 | 6183.79 | 594.28 | 30/04/2027 | 30/04/2027 |
| 427 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709864 | DCU Revamp Project | 370 | 370 | 266.35 | 17/07/2024 | 30/06/2026 |
| 428 | Oil & Gas | Ministry of Petroleum & Natural Gas | 709865 | Power Recovery Turbine [PRT] in PFCCU unit as an Energy Conservation Scheme | 294 | 293.5 | 97.22 | 31/12/2024 | 31/12/2025 |
| 429 | Healthcare | Ministry of Ports, Shipping and Waterways | 708662 | Establishment of 600 bed super specialty hospital with optional development of Medical college and further expansion on PPP basis. | 693 | 693 | 58 | 30/06/2026 | 31/12/2027 |
| 430 | Inland Waterways | Ministry of Ports, Shipping and Waterways | 611142 | Fairway Development in West Bengal Farakka - Kahelgaon | 177 | 197 | 183.32 | 31/07/2023 | 21/04/2024 |
| 431 | Inland Waterways | Ministry of Ports, Shipping and Waterways | 701565 | Jal Marg Vikas Project | 5369 | 5061.15 | 3526.99 | 31/12/2023 | 31/12/2025 |
| 432 | Shipping | Ministry of Ports, Shipping and Waterways | 400382 | Rewas Port Project | 6000 | 5999.89 | 31/03/2023 | ||
| 433 | Shipping | Ministry of Ports, Shipping and Waterways | 609424 | Development of Container Terminal at Tuna-Tekra, Deendayal Port on BOT Basis Under PPP Mode | 4244 | 800.04 | 13/03/2027 | ||
| 434 | Shipping | Ministry of Ports, Shipping and Waterways | 617804 | Mechanization of Berth No.14 for handling Containers and other cargo on DBFOT basis - Phase II | 153 | 50.1 | 31/03/2027 | ||
| 435 | Shipping | Ministry of Ports, Shipping and Waterways | 701564 | Construction of new dry dock at exisitng Cochin Shipyard Limited premises at Perumanoor, Kochi 682 015 | 1799 | 1558.39 | 31/12/2022 | 31/03/2025 | |
| 436 | Shipping | Ministry of Ports, Shipping and Waterways | 701568 | Construction of oil jetty No.8 at old kandla through internal resources | 100 | 225.85 | 166.48 | 03/02/2023 | 31/07/2024 |
| 437 | Shipping | Ministry of Ports, Shipping and Waterways | 701570 | Replacement and revamping of pipeline projects in oil jetty area, Kandla | 171 | 211.61 | 137.51 | 30/09/2023 | 31/03/2025 |
| 438 | Shipping | Ministry of Ports, Shipping and Waterways | 701574 | Deepening and Optimization of Inner Harbour facilities including development of Western Dock on BOT basis to handle Cape size vessels | 3005 | 1149.79 | 31/12/2027 | 16/10/2028 | |
| 439 | Shipping | Ministry of Ports, Shipping and Waterways | 701576 | Berth No. 2 [previously Berth 3] of HDC Mechanization Project | 298 | 298.26 | 438.5 | 30/09/2025 | 13/01/2026 |
| 440 | Shipping | Ministry of Ports, Shipping and Waterways | 701577 | Shalukkhali Liquid Cargo Handling Facility Development Project | 254 | 253.65 | 9.28 | 31/08/2025 | |
| 441 | Shipping | Ministry of Ports, Shipping and Waterways | 701586 | Setting up of a Floating Storage and Regasification Unit [FSRU] - Mumbai | 900 | 65 | 11/11/2026 | 11/11/2026 | |
| 442 | Tourism, Hospitality & Wellness | Ministry of Ports, Shipping and Waterways | 707215 | National Maritime Heritage Complex [NMHC] Phase-I | 573 | 1238.05 | 496.63 | 31/03/2024 | 30/09/2025 |
| 443 | Coal | Ministry of Power | 400192 | Tubed Coal Mine | 1581 | 598.06 | 31/05/2026 | 31/05/2026 | |
| 444 | Coal | Ministry of Power | 603293 | Badam Coal Mining project of NTPC | 502 | 784 | 313.88 | 31/12/2056 | 01/04/2027 |
| 445 | Electricity Generation | Ministry of Power | 400062 | Raghunathpur Thermal Power Station Phase II [2X660 MW] at Raghunathpur, Purulia, West Bengal | 17673 | 1408.8 | 30/06/2029 | ||
| 446 | Electricity Generation | Ministry of Power | 400261 | Patratu Thermal Power Station Expansion Project Phase-I [3x800 MW] | 17112 | 20302 | 17861.4 | 31/03/2023 | 30/11/2026 |
| 447 | Electricity Generation | Ministry of Power | 602096 | Subansiri Lower HE Project [2000 MW] | 6285 | 26075.5 | 25244.6 | 08/09/2010 | 31/05/2026 |
| 448 | Electricity Generation | Ministry of Power | 602181 | TEESTA-VI HE PROJECT, SIKKIM [500 MW], executed by LANCO TEESTA HYDRO POWER LIMITED [A wholly owned Subsidiary of NHPC LTD. acquired through NCLT] | 5748 | 5748.04 | 3817.49 | 07/03/2024 | 31/12/2027 |
| 449 | Electricity Generation | Ministry of Power | 602182 | Dibang Multipurpose Project | 31876 | 3708.61 | 26/02/2032 | 26/02/2032 | |
| 450 | Electricity Generation | Ministry of Power | 602184 | Rammam-III HEPP [3x40 MW] | 1382 | 1382.42 | 30/09/2019 | 31/03/2029 | |
| 451 | Electricity Generation | Ministry of Power | 602185 | Tapovan-Vishnugad HEP [4x130 MW] | 2978 | 10907.3 | 6769.58 | 31/03/2013 | 30/04/2029 |
| 452 | Electricity Generation | Ministry of Power | 602193 | Tehri Pumped Storage Plant Project [4x250 MW] | 4826 | 8339 | 8149.63 | 16/06/2022 | 31/12/2025 |
| 453 | Electricity Generation | Ministry of Power | 602194 | Khurja super Thermal Power Plant [2X660 MW] | 11089 | 13276.2 | 12888.2 | 02/02/2024 | 30/09/2025 |
| 454 | Electricity Generation | Ministry of Power | 602195 | Vishnugad Pipalkoti Hydro Electric Project [444 MW] | 3860 | 6823.72 | 5245.01 | 15/12/2022 | 31/03/2027 |
| 455 | Electricity Generation | Ministry of Power | 602525 | Pakal Dul [Drangdhuran] Hydroelectric Project, 1000 MW | 8112 | 12728 | 7581.19 | 27/04/2020 | 31/12/2026 |
| 456 | Electricity Generation | Ministry of Power | 602532 | Kiru HE Project | 4288 | 5409 | 3116.72 | 07/09/2023 | 31/12/2026 |
| 457 | Electricity Generation | Ministry of Power | 602535 | Ratle HE Project - 850 MW, Ratle Hydroelectric Power Corporation Limited. | 5282 | 1112.08 | 10/02/2026 | 28/11/2028 | |
| 458 | Electricity Generation | Ministry of Power | 602538 | Installation of FGD for 4x210 & 2x250 MW MTPS U 1-6 | 1037 | 929.99 | 22/01/2024 | 31/12/2025 | |
| 459 | Electricity Generation | Ministry of Power | 602579 | Buxar Thermal Power Project [1320 MW] | 10439 | 13756.6 | 12571.2 | 08/01/2024 | 31/12/2025 |
| 460 | Electricity Generation | Ministry of Power | 602582 | Dhaulasidh Hydro Electric Project [66 MW] | 688 | 1561.21 | 986.12 | 05/11/2025 | 31/03/2027 |
| 461 | Electricity Generation | Ministry of Power | 602593 | Luhri Stage-I Hydro Electric Project [210 MW] | 1811 | 3584.53 | 1793.11 | 19/01/2026 | 31/10/2029 |
| 462 | Electricity Generation | Ministry of Power | 602633 | 382 MW Sunni Dam HEP | 2615 | 495.57 | 31/03/2027 | ||
| 463 | Electricity Generation | Ministry of Power | 602961 | Talcher Thermal Power Station Stage III [2 x 660 MW] Expansion | 11844 | 12543 | 4839.68 | 31/05/2027 | 31/03/2028 |
| 464 | Electricity Generation | Ministry of Power | 605155 | Kwar HE Project | 4526 | 1094.54 | 10/11/2026 | 31/03/2028 | |
| 465 | Electricity Generation | Ministry of Power | 605156 | Rangit-IV HE Project [120 MW] executed by Jal Power Corporation Ltd. [JPCL] -A wholly owned subsidiary of NHPC Ltd. acquired through NCLT | 938 | 1828.11 | 1455.57 | 29/05/2024 | 28/12/2025 |
| 466 | Electricity Generation | Ministry of Power | 611509 | Koderma Thermal Power Station Phase II [2X800 MW] At Koderma, Jharkhand | 14358 | 1381.54 | 14/03/2029 | ||
| 467 | Electricity Generation | Ministry of Power | 611586 | Sunni Dam Hydro Electric Project [382 MW] | 2615 | 4540.71 | 1011.42 | 03/04/2028 | 31/12/2029 |
| 468 | Electricity Generation | Ministry of Power | 611698 | 240MW Heo HE Project | 1939 | 64.36 | 29/07/2029 | ||
| 469 | Electricity Generation | Ministry of Power | 611699 | 186 MW Tato-I H E Project | 1750 | 116.08 | 29/07/2029 | ||
| 470 | Electricity Generation | Ministry of Power | 611930 | Lara Super Thermal Power Project Stage-II [2 x 800 MW] | 15530 | 2874 | 30/06/2028 | ||
| 471 | Electricity Generation | Ministry of Power | 612142 | Singrauli Super Thermal Power Project, Stage-III [2x800 MW] | 17195 | 1979 | 28/02/2030 | ||
| 472 | Electricity Generation | Ministry of Power | 617188 | Sipat Super Thermal Power Project, Stage-III [1x800 MW] | 9791 | 856.56 | 30/09/2029 | ||
| 473 | Electricity Generation | Ministry of Power | 709747 | Bagodara Solar Power Project | 339 | 317.59 | 31/12/2025 | 31/12/2025 | |
| 474 | Electricity Generation | Ministry of Power | 709748 | BIKANER SOLAR POWER PROJECT | 5492 | 5084.68 | 04/04/2024 | 31/12/2025 | |
| 475 | Transmission & Distribution | Ministry of Power | 400005 | Transmission Network Expansion in Gujarat to increase its ATC from ISTS Part B | 4546 | 4210.3 | 12/06/2023 | 31/12/2025 | |
| 476 | Transmission & Distribution | Ministry of Power | 602223 | Comprehensive Scheme for Strengthening of Transmission and Distribution [T&D] Systems [CSST&DS] in Arunachal Pradesh and Sikkim | 4754 | 9129.32 | 7705.14 | 19/12/2018 | 31/03/2027 |
| 477 | Transmission & Distribution | Ministry of Power | 606781 | Transmission System for Strengthening of Srinagar-Leh Tr. System | 289 | 280.02 | 31/12/2024 | 30/11/2025 | |
| 478 | Transmission & Distribution | Ministry of Power | 607709 | NORTH EASTERN REGION POWER SYSTEM IMPROVEMENT PROJECT [NERPSIP] | 5111 | 6700 | 5317.79 | 31/12/2018 | 31/03/2026 |
| 479 | Transmission & Distribution | Ministry of Power | 608301 | Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan 8.1 GW under Phase II- Part- G1 | 359 | 341.49 | 30/09/2023 | 31/12/2025 | |
| 480 | Transmission & Distribution | Ministry of Power | 608302 | Transmission system for evacuation of Power from Pakaldul HEP in Chenab Valley HEPs - LTA System | 318 | 317.12 | 30/04/2025 | 30/11/2025 | |
| 481 | Transmission & Distribution | Ministry of Power | 608922 | Transmission System Strengthening Scheme for evacuation of power from SEZ in Rajasthan 8.1 GW under Phase II Part G | 1666 | 2218 | 2129.28 | 30/11/2023 | 30/11/2025 |
| 482 | Transmission & Distribution | Ministry of Power | 611656 | Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part B | 1168 | 1167 | 1147.74 | 31/03/2025 | 30/11/2025 |
| 483 | Transmission & Distribution | Ministry of Power | 611657 | Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part C | 2821 | 2736.36 | 31/03/2025 | 31/12/2025 | |
| 484 | Transmission & Distribution | Ministry of Power | 611659 | Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan[8.1 GW] under phase-II- Part E | 1433 | 1433 | 1418.67 | 30/09/2024 | 30/11/2025 |
| 485 | Transmission & Distribution | Ministry of Power | 611660 | Establishment of Khavda Pooling Station-2 KPS2 in Khavda RE Park KPS2 TRANSMISSION SYSTEM LIMITED | 967 | 936.24 | 31/12/2024 | 30/11/2025 | |
| 486 | Transmission & Distribution | Ministry of Power | 611735 | Transmission system for evacuation of power from REZ in Rajasthan 20GW under Phase-III Part J | 331 | 135.71 | 31/03/2025 | 31/07/2026 | |
| 487 | Transmission & Distribution | Ministry of Power | 611737 | Western Region Expansion Scheme-XXV | 386 | 382.4 | 30/11/2023 | 31/10/2025 | |
| 488 | Transmission & Distribution | Ministry of Power | 611947 | Transmission System for Evacuation of Power from REZ in Rajasthan 20GW under Phase III- Part E2 | 428 | 291.24 | 15/06/2025 | 31/03/2026 | |
| 489 | Transmission & Distribution | Ministry of Power | 611948 | Transmission system for evacuation of power from REZ in Rajasthan 20 GW under Phase-III part H | 2211 | 1945.93 | 30/04/2025 | 31/01/2026 | |
| 490 | Transmission & Distribution | Ministry of Power | 611949 | Transmission system for evacuation of power from REZ in Rajasthan 20 GW under Phase-III part C1 | 1796 | 1436.81 | 30/04/2025 | 31/03/2026 | |
| 491 | Transmission & Distribution | Ministry of Power | 611950 | Transmission system for evacuation of power from REZ in Rajasthan 20 GW under Phase-III part B1 | 2191 | 1949.58 | 30/04/2025 | 31/12/2025 | |
| 492 | Transmission & Distribution | Ministry of Power | 611951 | Transmission system for evacuation of power from REZ in Rajasthan 20GW under Phase-III Part E1 | 689 | 654.3 | 28/02/2025 | 31/12/2025 | |
| 493 | Transmission & Distribution | Ministry of Power | 611966 | Transmission System for Evacuation of power from Potential RE Zone in Khavda Area of Gujarat under phase IV 7GW-Part E4 | 224 | 33.66 | 09/07/2025 | 31/03/2026 | |
| 494 | Transmission & Distribution | Ministry of Power | 611967 | Transmission Scheme for Solar Energy Zone in Ananthpuram 2500MW and Kurnool 1000MW | 1249 | 998.95 | 30/09/2025 | 31/03/2026 | |
| 495 | Transmission & Distribution | Ministry of Power | 612132 | Transmission Scheme for Evacuation of power from REZ in Rajasthan [20 GW] under Phase-III Part D [Sikar Khetri Transmission Ltd] | 2000 | 1460 | 08/08/2025 | 30/06/2026 | |
| 496 | Transmission & Distribution | Ministry of Power | 612133 | Transmission System for Evacuation of power from Rajasthan REZ Ph-IV [Part-1] [Bikaner Complex] Part D [Neemrana Bareilly Transmission Ltd] | 2056 | 1603.68 | 26/12/2025 | 30/06/2026 | |
| 497 | Transmission & Distribution | Ministry of Power | 612134 | Transmission System for Evacuation of power from Rajasthan REZ Ph-IV [Part-1] [Bikaner Complex] Part A [Bikaner Neemrana Transmission Ltd] | 2998 | 2008.88 | 26/12/2025 | 30/06/2026 | |
| 498 | Transmission & Distribution | Ministry of Power | 612138 | Transmission Scheme for Solar Energy Zone in Bidar [2500 MW], Karnataka [Bidar Transmission Ltd] | 2148 | 1438.9 | 08/02/2026 | 30/06/2026 | |
| 499 | Transmission & Distribution | Ministry of Power | 612139 | Transmission system for Evacuation of Additional 7 GW RE power from Khavda RE park under Phase-III Part B [Vataman Transmission Limited] | 3752 | 1688.32 | 25/12/2025 | 31/12/2026 | |
| 500 | Transmission & Distribution | Ministry of Power | 612140 | Transmission Scheme for Integration of Renewable Energy Zone [Phase II] in Koppal II [Phase A&B] and gadag II[Phase A] in Karnataka [POWERGRID KOPPAL GADAG TRANSMISSION LIMITED] | 2889 | 1533.89 | 25/12/2025 | 30/06/2026 | |
| 501 | Transmission & Distribution | Ministry of Power | 612151 | Transmission System for Evacuation of Power from potential Renewable Energy zone in Khavda Area of Gujarat under Phase IV [7 GW] Part E3 | 334 | 118.1 | 31/07/2025 | 31/03/2026 | |
| 502 | Transmission & Distribution | Ministry of Power | 612855 | Transmission System for Evacuation of Power from Potential Energy Renewable Zone in Khavda Area of Gujarat under Ph-IV [7GW] Part E2 | 679 | 135.8 | 30/05/2026 | 30/06/2026 | |
| 503 | Transmission & Distribution | Ministry of Power | 612856 | Augmentation of 1x1500 MVA 3rd 765/400 kV transformation capacity at Kurnool New Substation | 164 | 85.07 | 26/09/2025 | 31/01/2026 | |
| 504 | Transmission & Distribution | Ministry of Power | 615332 | Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5 GW][Jaisalmer/Barmer Complex] Part B [SPV Name POWERGRID Sirohi Transmission Limited] | 3279 | 918.12 | 22/08/2026 | 31/12/2026 | |
| 505 | Transmission & Distribution | Ministry of Power | 615333 | Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5 GW] [Jaisalmer/Barmer Complex] Part D [SPV Name POWERGRID Beawar Mandsaur Transmission Limited] | 2227 | 779.45 | 21/08/2026 | ||
| 506 | Transmission & Distribution | Ministry of Power | 615334 | Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5 GW] [Jaisalmer/Barmer Complex] Part E [SPV Name POWERGRID Mewar Transmission Limited] | 3251 | 942.79 | 18/08/2026 | 31/03/2027 | |
| 507 | Transmission & Distribution | Ministry of Power | 615335 | Transmission System Strengthening for Interconnections of Bhadla-III & Bikaner III Complex [SPV Name POWERGRID BHADLA BIKANER TRANSMISSION LIMITED] | 1382 | 138.2 | 29/08/2026 | 31/12/2026 | |
| 508 | Transmission & Distribution | Ministry of Power | 615337 | Additional Transmission System for evacuation of Power from Bhadla-III PS as part of Rajasthan REZ Phase III Scheme [20 GW] [SPV Name POWERGRID Bhadla-III Power Transmission Limited] | 369 | 103.32 | 27/02/2026 | 31/03/2026 | |
| 509 | Transmission & Distribution | Ministry of Power | 615338 | TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH -IV [PART-2 5.5 GW] [JAISALMER/BARMER COMPLEX] PART F [SPV Name POWERGRID BARMER I TRANSMISSION LIMITED] | 2735 | 324.64 | 06/11/2026 | 30/06/2027 | |
| 510 | Transmission & Distribution | Ministry of Power | 615339 | Transmission system for evacuation of power from Rajasthan REZ Ph-IV [Part-3/6GW] [Bikaner complex] Part A [SPV Name POWERGRID Bikaner IV Transmission Limited] | 5969 | 485.87 | 11/11/2026 | 31/03/2027 | |
| 511 | Transmission & Distribution | Ministry of Power | 615340 | TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM RAJASTHAN REZ PH-IV [PART-3/ 6 GW] [BIKANER COMPLEX] PART B [SPV Name POWERGRID Siwani Transmission Limited] | 5357 | 428.56 | 11/11/2026 | 31/03/2027 | |
| 512 | Transmission & Distribution | Ministry of Power | 615342 | Augmentation of Transformation Capacity at jam Khambhaliya PS [GIS] [SPV Name POWERGRID Jam Khambhaliya Transmission Limited] | 329 | 13.17 | 14/07/2026 | ||
| 513 | Transmission & Distribution | Ministry of Power | 615343 | Provision of Dynamic Reactive Compensation at Khavda pooling Station 1 [KPS1] and Khavda Pooling station 3 [KPS3] | 501 | 8.11 | 06/11/2026 | ||
| 514 | Transmission & Distribution | Ministry of Power | 615344 | Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5GW] [Jaisalmer/Barmer Complex] Part H1 [POWERGRID KURAWAR TRANSMISSION LIMITED] | 3674 | 624.58 | 14/10/2026 | 31/03/2027 | |
| 515 | Transmission & Distribution | Ministry of Power | 615345 | Transmission System for Evacuation of Power from Potential Renewable Energy Zone in Khavda area of Gujarat under Phase-IV [7GW] Part B [SPV Name POWERGRID South Olpad Transmission Limited] | 4766 | 714.9 | 14/10/2026 | 31/03/2027 | |
| 516 | Transmission & Distribution | Ministry of Power | 615346 | Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5 GW] [Jaisalmer/Barmer Complex] Part C [SPV Name POWERGRID Mandsaur Transmission Limited] | 2708 | 1029.04 | 18/08/2026 | 31/12/2026 | |
| 517 | Transmission & Distribution | Ministry of Power | 615347 | TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-V [8 GW] PART A [SPV Name POWERGRID West Central Transmission Limited] | 24819 | 1985.46 | 18/05/2029 | ||
| 518 | Transmission & Distribution | Ministry of Power | 616670 | Transmission System for evacuation of Power from Rajasthan REZ Ph-IV [Part-4 3.5 GW] Part A [SPV name POWERGRID Ghiror Transmission Limited] | 5846 | 467.68 | 30/12/2026 | 31/03/2027 | |
| 519 | Transmission & Distribution | Ministry of Power | 616671 | Transmission System under ISTS for evacuation of Power from Kudankulam Unit-3&4 [2x1000 MW] [SPV Name POWERGRID Kudankulam Tarnsmission Limited] | 548 | 37.86 | 31/12/2026 | 31/12/2026 | |
| 520 | Transmission & Distribution | Ministry of Power | 616672 | System Strengthening at Koppal-II and GadagII for integration of RE generation projects [SPV Name POWERGRID Koppal Gadag Augmentation Transmission Limited] | 1354 | 40.62 | 01/06/2027 | ||
| 521 | Transmission & Distribution | Ministry of Power | 617068 | Augmentation of Transformation Capacity by 3x500 MVA, 400/220 KV ICTS [6th-8th] and 1x1500 MVA, 765/400 KV ICT [4th] at Bidar PS [SPV Name- POWERGRID Bidar Augmentation Transmission Limited] | 288 | 6.91 | 30/06/2027 | ||
| 522 | Transmission & Distribution | Ministry of Power | 617069 | Augmentation of Transformation Capacity at KPS1 [GIS] and KPS2 [GIS] [Phase-V Part B1 and Part B2 Scheme] [SPV Name- POWERGRID KPS1 and 2 Augmentation Transmission Limited] | 466 | 24.3 | 17/02/2027 | ||
| 523 | Transmission & Distribution | Ministry of Power | 617179 | Transmission Scheme for evacuation of Power from Ratle HEP [850 MW] & kiru [624 MW] Part B | 219 | 2.11 | 14/07/2026 | 31/03/2027 | |
| 524 | Transmission & Distribution | Ministry of Power | 617181 | Augmentation at Fatehgarh-II PS, Fatehgarh-IV PS [Section-II] and Barmer-I PS [POWERGRID Fatehgarh Barmer Augmentation Transmission Limited] | 404 | 16.16 | 20/12/2026 | 31/03/2027 | |
| 525 | Transmission & Distribution | Ministry of Power | 617182 | Augmentation of Banaskantha [Raghanesda] PS [GIS] [POWERGRID Banaskantha Transco Limited] | 172 | 17.27 | 23/03/2027 | ||
| 526 | Transmission & Distribution | Ministry of Power | 617183 | Transmission system strengthening at Kurnool- III PS for integration of additional RE generation projects [POWERGRID Kurnool III PS RE Transmission Limited] | 2886 | 131.31 | 31/12/2027 | ||
| 527 | Transmission & Distribution | Ministry of Power | 617184 | Transmission Scheme for integration of Davanagere/ Chitradurga and Bellary REZ in Karnataka [POWERGRID Chitradurga Bellary REZ Transmission Limited] | 3453 | 52.48 | 20/09/2027 | ||
| 528 | Transmission & Distribution | Ministry of Power | 617185 | Transmission System for Integration of Kurnool-IV REZ Phase-I [for 4.5 GW] [POWERGRID Kurnool-IV Transmission Limited] | 5550 | 332.68 | 23/03/2027 | ||
| 529 | Transmission & Distribution | Ministry of Power | 617186 | Rajasthan REZ Ph-V [Part-1- 4 GW] [Sirohi/Nagaur] Complex [Rajasthan V Power Transmission Limited] | 5028 | 256.93 | 23/03/2027 | ||
| 530 | Transmission & Distribution | Ministry of Power | 617269 | Transmission System for Strengthening to facilitate evacuation of power from Bhadla/Bikaner Complex | 213 | 2.1 | 09/06/2026 | 31/08/2026 | |
| 531 | Transmission & Distribution | Ministry of Power | 617270 | Eastern Region Expansion Scheme-44 [ERES-44] | 409 | 0.32 | 24/05/2026 | 31/03/2027 | |
| 532 | Transmission & Distribution | Ministry of Power | 617271 | Eastern Region Expansion Scheme-43 [ERES-43] | 343 | 0.71 | 01/03/2026 | 30/06/2026 | |
| 533 | Transmission & Distribution | Ministry of Power | 617272 | Implementation of LILO of both circuits of 400KV vindhyachal PS-Sasan D/C Line at Hindalco Switchyard | 370 | 18.55 | 06/12/2026 | ||
| 534 | Transmission & Distribution | Ministry of Power | 617279 | Transmission System for evacuation of power from Mahan Energen Limited Generating Station in Madhya Pradesh [SPV Name - POWERGRID MEL Power Transmission Limited] | 558 | 33.48 | 04/12/2027 | ||
| 535 | Transmission & Distribution | Ministry of Power | 617326 | Implementation of Transmission Systems in the State of Jharkhand consisting of 400/220/132/33 kV transmission lines and substations under Jharkhand Consultancy Project | 1842 | 1648.05 | 31/03/2026 | ||
| 536 | Transmission & Distribution | Ministry of Power | 617375 | North Eastern Region Expansion Scheme-XXIII [NERES-XXIII] | 209 | 0.03 | 03/02/2028 | ||
| 537 | Transmission & Distribution | Ministry of Power | 617391 | Augmentation of Transformation Capacity at Bhuj-II PS [GIS] | 488 | 0.12 | 23/11/2026 | 31/03/2027 | |
| 538 | Transmission & Distribution | Ministry of Power | 617405 | Jamnagar Transmission Limited | 4000 | 14/10/2026 | |||
| 539 | Transmission & Distribution | Ministry of Power | 617801 | Provision of ICT Augmentation & Bus Reactor at Bhuj-II PS | 582 | 0.2 | 18/12/2026 | 31/03/2027 | |
| 540 | Transmission & Distribution | Ministry of Power | 617802 | Augmentation of Transformation Capacity and Implementation of Line Bays at Mandsaur S/S for RE Interconnection [SPV Name- POWERGRID Mandsaur I RE Transmission Limited] | 319 | 0.1 | 30/03/2028 | ||
| 541 | Transmission & Distribution | Ministry of Power | 617803 | Transmission System Strengthening at Davanagere for Integration of RE Generation [SPV Name - POWERGRID Davanagere Power Transmission Limited] | 379 | 6.6 | 24/09/2027 | ||
| 542 | Transmission & Distribution | Ministry of Power | 900808 | Transmission System for Kurnool Wind Energy Zone/ Solar Energy Zone Part-A and Part-B | 3547 | 3369.59 | 30/11/2024 | 31/01/2026 | |
| 543 | Railways | Ministry of Railways | 400019 | DHULE [BORVIHIR] - NARDANA NEW LINE [50.60 KMS] | 493 | 1170.83 | 276.86 | 31/12/2026 | 30/09/2027 |
| 544 | Railways | Ministry of Railways | 400022 | Taranga Hill-Abu Road via Ambaji | 2798 | 2798 | 2014.6 | 31/07/2030 | 31/07/2030 |
| 545 | Railways | Ministry of Railways | 400023 | Construction of New BG line between Hassan to Belur [27 Km] | 749 | 30/04/2028 | 30/04/2027 | ||
| 546 | Railways | Ministry of Railways | 400045 | Proposed 6 nos Road Over Bridge [ROB] at different locations under MCL Talcher Under Deposit Scheme. | 168 | 69.85 | 31/03/2025 | 31/01/2025 | |
| 547 | Railways | Ministry of Railways | 400204 | Bahraich-Shravasti-Balrampur-Siddharthnagar -Santkabir nagar | 4940 | 4939.78 | 1251.81 | 30/10/2030 | 31/10/2030 |
| 548 | Railways | Ministry of Railways | 400205 | Sahjanwa-Dohrighat | 1320 | 1319.75 | 475.67 | 31/03/2029 | 31/03/2029 |
| 549 | Railways | Ministry of Railways | 400220 | Kharsia-Dharamjaygarh with Spur line [East Corridor-Phase 1] | 3055 | 3438 | 2594.89 | 30/09/2018 | 31/03/2026 |
| 550 | Railways | Ministry of Railways | 400223 | Nagapattinam-Tiruturaipundi and Karaikal-Peralam New Line | 713 | 981 | 598.38 | 31/03/2026 | 31/03/2027 |
| 551 | Railways | Ministry of Railways | 400232 | Brundamal-Jharsuguda- flyover connection for joining downline | 297 | 297 | 193.22 | 31/12/2026 | 31/12/2026 |
| 552 | Railways | Ministry of Railways | 400234 | Third Railway Line between Patratu-Sonnagar [281 kms] | 8975 | 8975 | 4950 | 31/03/2026 | 31/07/2026 |
| 553 | Railways | Ministry of Railways | 400247 | Kalinarayanpur-Krishnanagar Doubling Alongwith Krishnanagar - Chapra New Line And Naihati-Ranaghat 3rd Line. | 1000 | 1000 | 1053.4 | 28/02/2027 | 28/02/2027 |
| 554 | Railways | Ministry of Railways | 400253 | Vizianagaram - Titlagarh 3rd line [272 Km including By - pass line of 7.68 KM] | 4803 | 6670 | 5722.01 | 31/12/2026 | 31/12/2026 |
| 555 | Railways | Ministry of Railways | 400254 | Sakri -Hasanpur [via Harnagar - Kusheshwar Asthan] New Railway line | 735 | 588.66 | 31/12/2024 | 31/03/2027 | |
| 556 | Railways | Ministry of Railways | 400271 | Wardha-Nanded Via Yavatmal New BG Line | 3445 | 3445 | 3002.93 | 31/03/2028 | 31/03/2028 |
| 557 | Railways | Ministry of Railways | 400273 | Tarakeshwar-Bishnupur New Line [82.47 km] | 1189 | 1542 | 1323.68 | 31/03/2019 | 28/02/2026 |
| 558 | Railways | Ministry of Railways | 400275 | Tindivanam-Nagari New Line Project [184.5 km] | 3631 | 3631 | 1113.53 | 30/09/2016 | 31/03/2028 |
| 559 | Railways | Ministry of Railways | 400277 | Dum Dum Airport-New Garia via Rajarhat-Construction of Metro Railway | 8964 | 8964 | 8316.32 | 31/12/2025 | 31/03/2026 |
| 560 | Railways | Ministry of Railways | 400280 | Ph II extension of MRTS from Velachery to St Thomas Mount | 734 | 982 | 475.73 | 31/07/2024 | 31/08/2025 |
| 561 | Railways | Ministry of Railways | 400291 | Doubling of Kirandul-Jagdalpur Line [150 km] | 1589 | 1798 | 1566.97 | 31/03/2020 | 31/12/2025 |
| 562 | Railways | Ministry of Railways | 400298 | Nadikudi - Srikalahasti New Line | 2312 | 5200 | 2179 | 31/05/2027 | 31/03/2028 |
| 563 | Railways | Ministry of Railways | 602792 | Gauge Conversion of Kendri-Dhamtari including Abhanpur - Rajim Branch line 67.20 Kms - 2nd Material Modification to Raipur Titlagarh doubling. | 1171 | 1171 | 376 | 28/02/2025 | 31/03/2026 |
| 564 | Railways | Ministry of Railways | 602797 | Sainthia, Sitarampur, Mughalsarai, Allahabad & Etawah - Bypass Line Project | 462 | 461.64 | 192.72 | 31/03/2027 | 27/03/2027 |
| 565 | Railways | Ministry of Railways | 611452 | MUMBAI CENTRAL VIRAR VADODARA AHMEDABAAD TRAIN PROTECTION SYSTEM 500 RKM | 311 | 311 | 208 | 31/12/2025 | 26/06/2025 |
| 566 | Railways | Ministry of Railways | 611614 | Dedicated Test Track for RDSO Phase II | 819 | 967.06 | 471 | 30/11/2026 | 26/11/2026 |
| 567 | Railways | Ministry of Railways | 611615 | Malugur- Palasamudram New Line Project [17.975 Km] | 342 | 30/11/2027 | 31/12/2027 | ||
| 568 | Railways | Ministry of Railways | 611669 | NER Provision of Automatic Block Signalling on Gorakhpur Cantt[Excl] Chhapra Gramin & Burhwal Jn [Excl] Sitapur Jn section of high density routes | 380 | 24.53 | 31/03/2027 | ||
| 569 | Railways | Ministry of Railways | 611751 | AURANGABAD-ANKAI - DOUBLING PROJECT 98.25 Km | 961 | 511.61 | 31/03/2027 | ||
| 570 | Railways | Ministry of Railways | 611752 | GOOTY-PENDEKALLU DOUBLING 29.225 Km | 352 | 351.83 | 18 | 31/03/2027 | 27/03/2027 |
| 571 | Railways | Ministry of Railways | 611754 | GUNTAKAL WEST-MALLAPPA GATE RAIL OVER RAIL - ROR TRACK | 293 | 0 | 31/07/2026 | ||
| 572 | Railways | Ministry of Railways | 611849 | Devgarh Madariya - Nathdwara Gauge Conversion [82.54 Km] part of Marwar - Mavli Gauge Conversion [152 Km] | 969 | 137.16 | 01/06/2028 | 28/06/2028 | |
| 573 | Railways | Ministry of Railways | 611861 | Rewari - Kathuwas Doubling Project [27.72 Km] | 352 | 352 | 271.93 | 30/06/2027 | 27/06/2027 |
| 574 | Railways | Ministry of Railways | 611884 | Bhiwani - Dobh Bahali Doubling Project [42.30 Km] | 471 | 471 | 215.11 | 29/02/2028 | 28/02/2028 |
| 575 | Railways | Ministry of Railways | 611918 | Kosamba Umarpada 70 Km | 468 | 20.28 | 30/03/2027 | ||
| 576 | Railways | Ministry of Railways | 611927 | Kurnool - Setting up facilities for coach midlife rehabilitation workshop | 561 | 276.66 | 31/12/2023 | ||
| 577 | Railways | Ministry of Railways | 611929 | Maintenance cum workshop depot for Vande Bharat Sleeper Trains as per conditions under WTA 527 | 167 | 0 | 29/12/2024 | ||
| 578 | Railways | Ministry of Railways | 611937 | Adraj Moti Vijapur 40 Kms | 418 | 417.53 | 494.13 | 31/05/2026 | 31/12/2025 |
| 579 | Railways | Ministry of Railways | 611943 | New Broad Gauge line between Naliya to Jakhau Port | 410 | 410.26 | 6.6 | 31/01/2028 | 28/01/2028 |
| 580 | Railways | Ministry of Railways | 611944 | Quadrupling between Gandhidham Adipur with Y connection at Adipur for providing direct entry towards Mundra Port and Bhuj and high level platform at Gopalpur 11Kms | 152 | 152.44 | 101.74 | 31/03/2026 | 26/03/2026 |
| 581 | Railways | Ministry of Railways | 611945 | Petlad Bhadran 23 Kms | 307 | 307.11 | 13.58 | 31/05/2030 | 30/05/2030 |
| 582 | Railways | Ministry of Railways | 611970 | Samlaya Timba Road 54 km | 670 | 670.17 | 44.8 | 31/03/2030 | 30/03/2030 |
| 583 | Railways | Ministry of Railways | 611971 | Samni Jambusar 24 km | 350 | 349.93 | 67.73 | 31/03/2030 | 30/03/2030 |
| 584 | Railways | Ministry of Railways | 611974 | Western Railway Samakhiali Gandhidham Quadrupiling 53 Kms | 1430 | 220.11 | 30/12/2026 | 30/06/2027 | |
| 585 | Railways | Ministry of Railways | 611977 | Dahod Creation of Infrastructure facilities for 9000 HP Electric locomotives Manufacturing at | 487 | 108.69 | 28/02/2025 | ||
| 586 | Railways | Ministry of Railways | 611978 | Dahod Rolling Stock Workshop Provision of Infrastructure for CBS at | 158 | 47.31 | 31/03/2025 | ||
| 587 | Railways | Ministry of Railways | 611979 | Sabarmati Setting up of Maintenance Facilities for Train Sets Phase ii | 250 | 0 | 30/06/2025 | ||
| 588 | Railways | Ministry of Railways | 612072 | 4th LINE BETWEEN BAREJADI NANDEJ-SANAND-AHMEDABAD BYPASS | 962 | 961.67 | 335.93 | 31/03/2027 | 31/07/2028 |
| 589 | Railways | Ministry of Railways | 612096 | Construction of Balurghat-Hilli new BG Line | 1209 | 1209 | 405.31 | 31/03/2027 | 27/03/2025 |
| 590 | Railways | Ministry of Railways | 612815 | 4th line between Nipania Bhatapara 14.4 Km | 170 | 1.34 | 31/03/2027 | ||
| 591 | Railways | Ministry of Railways | 612827 | Flyover between Pendurthi and Simhachalam North to avoid surface crossing at Simhachalam 7.135 km PB 73 of 2023 24 NR | 184 | 5.11 | 30/04/2027 | ||
| 592 | Railways | Ministry of Railways | 612834 | 3rd & 4th line between Sarla - Sason [8 km] [PB 73/2023-24/NR] | 252 | 88.95 | 28/12/2025 | ||
| 593 | Railways | Ministry of Railways | 613002 | Redevelopment of Chennai Egmore Station | 842 | 340 | 31/03/2026 | ||
| 594 | Railways | Ministry of Railways | 613003 | Dharamjaigarh-Korba 63 km | 1686 | 288.83 | 31/08/2026 | ||
| 595 | Railways | Ministry of Railways | 613015 | Redevelopment of Chhatrapati Shivaji Maharaj Terminus [CSMT] and construction of associated infrastructure | 1813 | 600.75 | 31/03/2027 | ||
| 596 | Railways | Ministry of Railways | 613785 | Redevelopment of New Delhi Railway Station and construction of associated infrastructure | 4744 | 119.95 | 31/12/2028 | ||
| 597 | Railways | Ministry of Railways | 613786 | Redevelopment of Ahmedabad railway station and associated infrastructure on engineering, procurement and construction mode | 2379 | 726.91 | 31/03/2028 | ||
| 598 | Railways | Ministry of Railways | 616586 | Bangriposi-Gorumahisani new line [ 85.60 km ] | 2269 | 3.06 | 31/12/2029 | ||
| 599 | Railways | Ministry of Railways | 616587 | Badampahar-Kendujhargarh new line [82.06 km] | 1876 | 0.91 | 31/12/2029 | ||
| 600 | Railways | Ministry of Railways | 616588 | Buramara-Chakulia new line [59.96 km] | 1459 | 3.32 | 31/12/2029 | ||
| 601 | Railways | Ministry of Railways | 616695 | Paradeep - Badabandha 3rd & 4th Line / 18.51kms | 300 | 30/11/2028 | |||
| 602 | Railways | Ministry of Railways | 616697 | 3rd & 4th line between Vadlapudi -Gate Jn. cabin and Tie line between Gate Junction to Gangavaram port | 154 | 20.15 | 30/06/2026 | ||
| 603 | Railways | Ministry of Railways | 616699 | Multi tracking of Son Nagar-Andal 374.53 rkm & 814.38 tkm | 12334 | 520.39 | 31/03/2028 | ||
| 604 | Railways | Ministry of Railways | 616701 | Lumding Furkating Doubling Project 140 km | 2124 | 13.74 | 29/02/2028 | ||
| 605 | Railways | Ministry of Railways | 616841 | PUSHKAR- MERTA CITY NEW LINE | 800 | 14.64 | 31/12/2026 | ||
| 606 | Railways | Ministry of Railways | 616842 | LUNI- SAMDARI- BHILDI DOUBLING | 3086 | 329.31 | 31/07/2027 | ||
| 607 | Railways | Ministry of Railways | 616843 | AJMER- CHANDERIYA DOUBLING | 1635 | 123.05 | 30/06/2027 | ||
| 608 | Railways | Ministry of Railways | 616856 | Doubling between Bhadrachalam Road and Dornakal | 770 | 16.34 | 13/04/2029 | ||
| 609 | Railways | Ministry of Railways | 616857 | Doubling between Motumari Vishnupuram - 88.81 Km and Rail over Rail - RoR at Motumari - 10.877 Km | 1596 | 14.27 | 31/03/2029 | ||
| 610 | Railways | Ministry of Railways | 617200 | KHARSIA- NAYA RAIPUR-PARMALKASA 5th and 6th Line [278KM] | 7854 | 31/03/2031 | |||
| 611 | Railways | Ministry of Railways | 617201 | Gondia-Balharshah [Chanda Fort] Doubling [240 Km] | 4373 | 31/03/2031 | |||
| 612 | Railways | Ministry of Railways | 617210 | Tiupati Katpadi 104.39 kms | 1216 | 0.1 | 31/03/2029 | ||
| 613 | Railways | Ministry of Railways | 617211 | Doubling of Guntur Bibinagar 239 Km | 2853 | 62.29 | 31/03/2029 | ||
| 614 | Railways | Ministry of Railways | 617212 | Doubling between Mudkhed Medchal & Mahbubnagar Dhone section 417.88 Km | 4686 | 668.81 | 31/03/2029 | ||
| 615 | Railways | Ministry of Railways | 617214 | Rail Connectivity to Errupalem Amravati Namburu 57 Km | 2047 | 14.49 | 31/03/2027 | ||
| 616 | Railways | Ministry of Railways | 617215 | Doubling between Parbhani Parli Vaijanath stations 64.71 Km | 770 | 20.91 | 31/03/2028 | ||
| 617 | Railways | Ministry of Railways | 617216 | 3rd Line between Gudur Renigunta 83.17 Km | 877 | 23.35 | 31/03/2027 | ||
| 618 | Railways | Ministry of Railways | 617224 | Gorakhpur-Valmikinagar Doubling project | 1120 | 247.46 | 30/12/2027 | ||
| 619 | Railways | Ministry of Railways | 617231 | Construction of Bulb line at Nabinagar Ankorah of East Central Railway | 612 | 30/06/2028 | |||
| 620 | Railways | Ministry of Railways | 617252 | Anandnagar - Ghugli via Maharajganj New line 52.7 km | 958 | 449.37 | 21/03/2028 | ||
| 621 | Railways | Ministry of Railways | 617284 | Chunar-Chopan doubling project | 1424 | 53.81 | 31/03/2028 | ||
| 622 | Railways | Ministry of Railways | 617290 | Jeypore - Malkangiri New BG Line Project | 2344 | 630.83 | 31/12/2030 | ||
| 623 | Railways | Ministry of Railways | 617320 | New B.G Railway Line between Jeypore & Navarangpur [38 Km] with Electrification | 748 | 7.21 | 20/09/2025 | ||
| 624 | Railways | Ministry of Railways | 617321 | Godhani-Kalumna Chord 13.7 km | 150000 | 1940 | 31/07/2028 | ||
| 625 | Railways | Ministry of Railways | 617333 | Surface triangle line bet. Bhadura stn and new crossing stn Karma | 200 | 28/02/2027 | |||
| 626 | Railways | Ministry of Railways | 617345 | SER Upgradation of maintenance infrastructure at Shalimar into Vande Bharat Chair Car maintenance cum workshop depot. | 227 | 0.21 | 22/10/2026 | ||
| 627 | Railways | Ministry of Railways | 617361 | Babupeth - Sasti New Rail Line [13.114 KMs] | 363 | 362.81 | 31/03/2028 | ||
| 628 | Railways | Ministry of Railways | 617364 | Double Chord line Between Nilaje-Kopar | 338 | 205 | 3.42 | 26/07/2028 | |
| 629 | Railways | Ministry of Railways | 617370 | Doubling between Jaunpur Jn - Zaffarabad 6.28 km | 181 | 4 | 30/01/2027 | ||
| 630 | Railways | Ministry of Railways | 617372 | Doubling between Pradhankunta-Patherih-Bhojudih of East Central Railway | 349 | 106.11 | 31/12/2025 | ||
| 631 | Railways | Ministry of Railways | 617373 | Jhajha-Batai New Line Project | 588 | 3.05 | 31/03/2027 | ||
| 632 | Railways | Ministry of Railways | 617374 | Dallirajhara - Rowghat New Rail Line Project, Phase-I | 1516 | 873.79 | 31/03/2025 | ||
| 633 | Railways | Ministry of Railways | 617379 | Development of New Bijwasan Railway Terminal | 446 | 511.94 | 31/03/2020 | ||
| 634 | Railways | Ministry of Railways | 617390 | Sardega -Bhalumuda New Double line [37.24 Km] | 1282 | 128 | 31/03/2028 | ||
| 635 | Railways | Ministry of Railways | 617403 | SADULPUR - CHURU DOUBLING PROJECT | 469 | 125.08 | 30/06/2026 | ||
| 636 | Railways | Ministry of Railways | 617404 | POKHRAN - RAMDEVRA New Line | 189 | 31/03/2028 | |||
| 637 | Railways | Ministry of Railways | 617406 | RATLAM- DUNGARPUR VIA BANSWARA NEW LINE PROJECT | 2417 | 5.66 | 31/03/2028 | ||
| 638 | Railways | Ministry of Railways | 617408 | NATHDWARA- NATHDWARA TOWN NL | 166 | 81.41 | 31/03/2027 | ||
| 639 | Railways | Ministry of Railways | 617409 | Railway Manufacturing Unit | 521 | 420 | 31/12/2026 | ||
| 640 | Railways | Ministry of Railways | 703585 | Yeshvanthpur - Channasandra Doubling Project [21.70 Km] | 314 | 683.57 | 152.31 | 31/03/2024 | 31/03/2026 |
| 641 | Railways | Ministry of Railways | 703586 | Baiyyappanahalli - Hosur Doubling Project [48 km] | 499 | 748.7 | 630.41 | 31/03/2024 | 31/01/2026 |
| 642 | Railways | Ministry of Railways | 705237 | Western Dedicated Freight Corridor | 51101 | 124005 | 124623 | 31/03/2022 | 31/12/2025 |
| 643 | Railways | Ministry of Railways | 705244 | Coach Production Factory Upgradation Project | 520 | 192.25 | 31/12/2021 | ||
| 644 | Railways | Ministry of Railways | 705252 | Kazipet Wagon Overhauling Project | 385 | 0 | 01/12/2023 | ||
| 645 | Railways | Ministry of Railways | 705253 | Kurnool Coach Midlife Rehabilitation Project | 563 | 120 | 01/12/2020 | ||
| 646 | Railways | Ministry of Railways | 705298 | North Region Video Surveillance Project | 274 | 0 | 31/03/2024 | ||
| 647 | Railways | Ministry of Railways | 705300 | Western Region Video Surveillance Project | 228 | 0 | 31/12/2023 | ||
| 648 | Railways | Ministry of Railways | 705356 | Ahmednagar - Beed - Parli - Vaijnath New Broad Gauge Line Railway Project [261.3 km] | 2539 | 4957.27 | 5091.94 | 31/03/2026 | 31/03/2026 |
| 649 | Railways | Ministry of Railways | 705357 | Baramati Lonand New Line Project | 138 | 1843.9 | 845.56 | 31/03/2027 | 31/03/2027 |
| 650 | Railways | Ministry of Railways | 705358 | Khurda-Bolangir New Broad Gauge Rail Link [301km] | 3792 | 5089 | 5147.89 | 31/12/2026 | 31/12/2026 |
| 651 | Railways | Ministry of Railways | 705359 | Talcher-Bimlagarh New Railway Line | 1928 | 1928 | 1955.9 | 31/03/2025 | 31/03/2027 |
| 652 | Railways | Ministry of Railways | 705362 | Jaynagar-Bijalpura, incl. extn. Bet, Bijalpura-Bardibas [Nepal] | 819 | 819 | 580.51 | 31/03/2022 | 31/03/2026 |
| 653 | Railways | Ministry of Railways | 705364 | Khagaria-Kusheshwar Asthan [42Km] new line project | 614 | 1384 | 487.99 | 31/12/2024 | 31/03/2027 |
| 654 | Railways | Ministry of Railways | 705366 | Hajipur-Sagauli New line | 2067 | 2087 | 2013.82 | 31/03/2020 | 31/12/2026 |
| 655 | Railways | Ministry of Railways | 705368 | Araria Supaul New BG Line | 1605 | 2514 | 1547.96 | 31/03/2024 | 31/01/2027 |
| 656 | Railways | Ministry of Railways | 705373 | Fatuha-Islampur incl. MM for extn.of NL from Neora to Daniawan , Daniawan to Biharsharif, Biharsharif to Barbigha , Barbigha to Shekhpura | 1473 | 2882 | 2535.73 | 31/03/2023 | 31/08/2025 |
| 657 | Railways | Ministry of Railways | 705375 | Koderma-Tilaiya New Line | 1626 | 2486.62 | 2113.82 | 28/02/2025 | 28/02/2026 |
| 658 | Railways | Ministry of Railways | 705385 | Pirpainti - Jasidih [100.52 Km] New BG line | 2555 | 2555 | 780.18 | 31/03/2028 | 31/03/2028 |
| 659 | Railways | Ministry of Railways | 705391 | Jiribam-Imphal new line project | 14323 | 21885.9 | 15598.1 | 31/12/2026 | 30/06/2029 |
| 660 | Railways | Ministry of Railways | 705392 | Dimapur [Dhansiri]-Sukhobi Kohima [Zubza] NL [82.5 Km] | 6663 | 6663 | 5571.82 | 26/03/2025 | 29/12/2025 |
| 661 | Railways | Ministry of Railways | 705401 | Murkongselek-Pasighat | 435 | 1250 | 542.07 | 31/03/2025 | 31/05/2026 |
| 662 | Railways | Ministry of Railways | 705410 | Nangal Dam-Talwara New Broad Gauge Line [84 KM] and Taking Over Siding Mukerian-Talwara [29 KM] | 2018 | 2018 | 2053.9 | 31/12/2025 | 31/01/2027 |
| 663 | Railways | Ministry of Railways | 705419 | Gwalior - Seopurkala with extension to Kota [Gauge Conversion] | 2913 | 2913 | 2109.86 | 31/03/2025 | 28/02/2026 |
| 664 | Railways | Ministry of Railways | 705424 | Chandigarh-Baddi New Rail Line- 36 km | 1540 | 1540.13 | 527.66 | 31/12/2026 | 31/12/2026 |
| 665 | Railways | Ministry of Railways | 705428 | Bhanupalli-Bilaspur-Beri New Railway Line Project | 13447 | 13447 | 6928.81 | 31/12/2026 | 30/12/2027 |
| 666 | Railways | Ministry of Railways | 705429 | Rishikesh-Karnaprayag New Rail Line- 125 km | 38953 | 38953 | 24645.2 | 31/12/2025 | 31/03/2027 |
| 667 | Railways | Ministry of Railways | 705432 | Sivok-Rangpo New Rail Line | 7877 | 12133 | 9039.91 | 31/05/2015 | 31/12/2027 |
| 668 | Railways | Ministry of Railways | 705433 | Dallirajhra- Rowghat New Railway Line - Phase I [95 km] | 1628 | 1628 | 1440.85 | 30/09/2025 | 31/12/2025 |
| 669 | Railways | Ministry of Railways | 705434 | New Railway Line between Ginigera and Raichur [165.57 km] | 2565 | 3034.98 | 2105.62 | 31/03/2019 | 31/03/2027 |
| 670 | Railways | Ministry of Railways | 705436 | Kotapalli - Narasapur New Line | 2501 | 2501 | 1318.88 | 31/03/2028 | 31/03/2028 |
| 671 | Railways | Ministry of Railways | 705437 | Manoharabad-Kothapalli New Rail Line [151 km] | 1160 | 2781 | 1985.73 | 31/03/2027 | 31/12/2027 |
| 672 | Railways | Ministry of Railways | 705444 | Gevra Road-Pendra Road New Railway Line [135 km] | 4970 | 4449.99 | 31/03/2022 | 31/12/2025 | |
| 673 | Railways | Ministry of Railways | 705450 | Jogbani-Biratnagar New Rail Line project | 402 | 486 | 367.54 | 31/03/2022 | 31/12/2026 |
| 674 | Railways | Ministry of Railways | 705453 | New line Dahod-Indore via Sardarpur, Jabuwa and Dhar | 456 | 3516.77 | 3633.27 | 28/02/2027 | 28/02/2027 |
| 675 | Railways | Ministry of Railways | 705454 | Chhota Udaipur - Dhar New Line Project [157 km] | 1794 | 1794 | 1815.94 | 27/12/2025 | 27/12/2025 |
| 676 | Railways | Ministry of Railways | 705457 | Ratlam-Mhow-Khandwa-Akola Gauge Conversion | 1656 | 6499.86 | 4445.82 | 31/03/2027 | 30/09/2028 |
| 677 | Railways | Ministry of Railways | 705458 | Miyagam-Karjan-Dabhoi-Samlaya [GC] | 484 | 1039.13 | 621.53 | 31/03/2021 | 31/12/2026 |
| 678 | Railways | Ministry of Railways | 705479 | Wadsa-Gadchiroli | 1886 | 1886 | 727.89 | 31/03/2027 | 31/03/2027 |
| 679 | Railways | Ministry of Railways | 705480 | Lalitpur-Satna, Rewa-Singrauli & Mahoba-Khajuraho | 8914 | 8914 | 5013.49 | 31/03/2027 | 31/12/2027 |
| 680 | Railways | Ministry of Railways | 705481 | Ramganjmandi-Bhopal New Line Project [262 km] | 3032 | 5073 | 3723.61 | 25/12/2025 | 31/12/2027 |
| 681 | Railways | Ministry of Railways | 705482 | Dholpur - Sirmuttra Gauge Conversion | 747 | 747 | 378.05 | 28/02/2019 | 28/02/2027 |
| 682 | Railways | Ministry of Railways | 705490 | Gadag-Wadi New Railway Line [257 km] | 2842 | 6700 | 1400.27 | 31/03/2027 | 31/12/2027 |
| 683 | Railways | Ministry of Railways | 705491 | Marikuppam - Kuppam New Line Project [23.70 Km] | 297 | 297 | 134.31 | 30/06/2026 | 30/06/2026 |
| 684 | Railways | Ministry of Railways | 705492 | Kadur - Chickamagalur - Sakleshpur [93km] | 825 | 825 | 699.12 | 30/06/2025 | 31/12/2025 |
| 685 | Railways | Ministry of Railways | 705494 | Rayadurg-Tumkur via Kalyandurg New Line [207 km] | 2496 | 2496 | 1739.53 | 30/09/2015 | 29/02/2028 |
| 686 | Railways | Ministry of Railways | 705495 | Bagalkot-Kudachi New Railway Line [142 km] | 1378 | 1649 | 716.65 | 31/03/2027 | 31/01/2027 |
| 687 | Railways | Ministry of Railways | 705496 | Tumkur-Chitradurga-Davangere New Rail Line Project [191 km] | 1876 | 1876 | 436.37 | 31/03/2019 | 31/12/2027 |
| 688 | Railways | Ministry of Railways | 705498 | 3rd Line Kalyan - Kasara [67.35 Kilometres] | 793 | 1395.79 | 931.97 | 31/12/2026 | 31/12/2026 |
| 689 | Railways | Ministry of Railways | 705500 | 3rd Line Wardha - Sewagram - Nagpur | 540 | 944.24 | 779.07 | 31/12/2025 | 31/12/2025 |
| 690 | Railways | Ministry of Railways | 705502 | 3rd Line Wardha - Ballarshah [132 Kilometres] | 1385 | 2033.59 | 1705.4 | 31/12/2025 | 28/02/2026 |
| 691 | Railways | Ministry of Railways | 705503 | Pune - Miraj-Londa [467 Kilometres] | 4028 | 4872.52 | 4924.05 | 28/02/2025 | 31/08/2025 |
| 692 | Railways | Ministry of Railways | 705504 | Doubling of Daund Manmad Line [247.6 km] | 2081 | 3267.06 | 2861.77 | 01/12/2025 | 31/03/2026 |
| 693 | Railways | Ministry of Railways | 705505 | 4th Line Wardha - Nagpur [78.7 Kilometres] | 638 | 1341.28 | 1010.3 | 31/12/2025 | 28/02/2026 |
| 694 | Railways | Ministry of Railways | 705506 | 3rd Line Manmad - Jalgaon [160 Kilometres] | 1035 | 1558.75 | 1726.94 | 31/12/2024 | 31/08/2025 |
| 695 | Railways | Ministry of Railways | 705507 | Itarsi - Nagpur Third Railway Line [280 km] | 2450 | 2506.68 | 1850.73 | 31/03/2027 | 31/03/2027 |
| 696 | Railways | Ministry of Railways | 705510 | Bhadrak-Nergundi Third Line | 1284 | 1284 | 1298 | 30/11/2024 | 31/01/2026 |
| 697 | Railways | Ministry of Railways | 705511 | Jagdalpur-Koraput | 1547 | 1547 | 1329.73 | 31/03/2024 | 31/12/2026 |
| 698 | Railways | Ministry of Railways | 705512 | Doubling of Kottavalasa-Koraput Rail Line [189 KM] | 2500 | 2500 | 2023.97 | 31/03/2022 | 31/03/2028 |
| 699 | Railways | Ministry of Railways | 705513 | Koraput - Singapur Railway Doubling | 2362 | 2362 | 1825.42 | 01/12/2027 | 30/03/2028 |
| 700 | Railways | Ministry of Railways | 705514 | Jarapada- Budhapank with flyover at Talcher road 3rd and 4th Line | 1000 | 810.02 | 415.46 | 13/11/2018 | 31/03/2026 |
| 701 | Railways | Ministry of Railways | 705515 | 3rd & 4th Railway Line Project from Salegaon to Budhapank via Rajathgarh. | 1173 | 2092 | 1971 | 31/03/2026 | 31/03/2026 |
| 702 | Railways | Ministry of Railways | 705520 | Vizianagaram-Sambhalpur 3rd Line Project | 4803 | 2979.23 | 31/03/2025 | ||
| 703 | Railways | Ministry of Railways | 705526 | Samastipur-Darbhanga Doubling Railway Project | 519 | 519 | 367.57 | 31/03/2025 | 31/10/2025 |
| 704 | Railways | Ministry of Railways | 705527 | Sagauli-Valmiknagar | 1216 | 2222 | 2072.37 | 24/12/2025 | 25/12/2025 |
| 705 | Railways | Ministry of Railways | 705528 | Muzaffarpur-Sugauli | 1586 | 1586 | 1470.4 | 30/06/2024 | 28/02/2026 |
| 706 | Railways | Ministry of Railways | 705562 | Chhapra-Ballia Patch Doubling | 963 | 1046 | 911.66 | 25/02/2025 | 26/03/2026 |
| 707 | Railways | Ministry of Railways | 705567 | Burhwal Gonda 3rd line | 1016 | 1118 | 1410.08 | 25/03/2025 | 31/01/2026 |
| 708 | Railways | Ministry of Railways | 705572 | Doubling of New Bonggigaon to Kamakhya via Goalpara - 176 km | 4060 | 4961 | 3727.78 | 31/03/2026 | 31/03/2026 |
| 709 | Railways | Ministry of Railways | 705583 | Anand Vihar-Tilak Bridge 3rd & 4th line | 667 | 667 | 287.26 | 31/03/2023 | 31/12/2027 |
| 710 | Railways | Ministry of Railways | 705588 | Janghai-Pratapgarh- Amethi | 722 | 1194 | 1567 | 31/03/2025 | 31/03/2026 |
| 711 | Railways | Ministry of Railways | 705598 | Jhansi - Bina Third Railway Line [153 Km] | 2002 | 2002 | 1806.86 | 31/03/2022 | 31/03/2026 |
| 712 | Railways | Ministry of Railways | 705608 | Jhansi-Khairar-Manikpur & Khirar-Bhimsen | 4330 | 4330 | 2417.11 | 31/03/2026 | 31/03/2026 |
| 713 | Railways | Ministry of Railways | 705610 | Renigunta, Wadi & Gooty Bypass Railway Project | 302 | 543 | 381 | 31/12/2025 | 25/12/2025 |
| 714 | Railways | Ministry of Railways | 705612 | Kazipet-Vijayawada 3rd line with electrification [220 km] | 1953 | 3363 | 3436.15 | 28/02/2025 | 31/12/2025 |
| 715 | Railways | Ministry of Railways | 705613 | Third Line [new] between Kazipet - Balharshah with electrification [201.04 Km] | 2595 | 3071 | 3396.31 | 31/01/2025 | 30/11/2025 |
| 716 | Railways | Ministry of Railways | 705616 | Jharsuguda-Bilaspur Fourth Railway Line [206 km] | 2140 | 2979 | 2196.74 | 31/10/2024 | 31/12/2025 |
| 717 | Railways | Ministry of Railways | 705617 | Rajnandgaon - Nagpur [Kalumna] Third Railway Line [228.30 km] | 3545 | 3545 | 3507.04 | 31/12/2024 | 30/06/2026 |
| 718 | Railways | Ministry of Railways | 705628 | Doubling of Hatia [Ranchi]-Bondamunda Rail Line - 159 km | 3029 | 3029.04 | 2501.09 | 30/06/2025 | 30/06/2026 |
| 719 | Railways | Ministry of Railways | 705629 | Narayangarh-Bhadrak 3rd line | 2400 | 2400 | 2311.95 | 31/12/2025 | 30/06/2026 |
| 720 | Railways | Ministry of Railways | 705632 | Vijayawada - Kazipet Byepass line | 647 | 904 | 945.51 | 12/01/2025 | 31/12/2025 |
| 721 | Railways | Ministry of Railways | 705633 | Guntur-Guntakal Doubling Project | 3733 | 4295 | 4475.84 | 31/12/2025 | 31/12/2026 |
| 722 | Railways | Ministry of Railways | 705635 | Trivandrum- Kanyakumari | 1432 | 3785.45 | 2505.8 | 24/03/2025 | 31/12/2026 |
| 723 | Railways | Ministry of Railways | 705638 | Kumbalam-Turavur doubling project [15.59 Km] | 813 | 802.8 | 66.7 | 31/03/2027 | 31/03/2027 |
| 724 | Railways | Ministry of Railways | 705639 | Ernakulam-Kumbalam doubling project [7.71 Km] | 601 | 595.39 | 289.52 | 31/03/2028 | 28/02/2027 |
| 725 | Railways | Ministry of Railways | 705648 | Vijaywada-Gudur 3rd Line | 6654 | 6654 | 5922 | 30/11/2024 | 31/12/2025 |
| 726 | Railways | Ministry of Railways | 705650 | Hospet - Tinaighat - Vasco Rail Doubling Project | 5060 | 5060 | 5246.91 | 31/03/2027 | 30/12/2027 |
| 727 | Railways | Ministry of Railways | 705651 | Katni - Bina Third Railway Line [279 km] | 2478 | 4127.23 | 3330.66 | 31/03/2022 | 31/12/2025 |
| 728 | Railways | Ministry of Railways | 705659 | Satna-Rewa Railway Line Doubling Project | 500 | 584 | 565.61 | 31/03/2026 | 31/03/2026 |
| 729 | Railways | Ministry of Railways | 705660 | Doubling of Katni - Singrauli Railway Line [261 km] | 2445 | 4377 | 3234.88 | 26/12/2025 | 27/12/2025 |
| 730 | Railways | Ministry of Railways | 705661 | Katni Grade Separator/Bye Pass | 1248 | 1248 | 1651.34 | 30/09/2024 | 31/03/2026 |
| 731 | Railways | Ministry of Railways | 705662 | Hotgi-Kudgi-Gadag Doubling Project | 1878 | 2459 | 2684.66 | 31/12/2024 | 31/03/2026 |
| 732 | Railways | Ministry of Railways | 705663 | Bangalore-Whitefield-Bangalore City-Krishnarajapuram [23.08 km] - Quadrupling | 493 | 493 | 252.45 | 28/02/2026 | 28/02/2026 |
| 733 | Railways | Ministry of Railways | 705667 | Mathura-Jhansi Third Railway Line [274 Km] | 5961 | 5961 | 4964.19 | 31/12/2024 | 31/12/2026 |
| 734 | Railways | Ministry of Railways | 705668 | KHARAGPUR-ADITYAPUR THIRD RAIL LINE- 132 KM | 3250 | 3250 | 3176.46 | 31/03/2025 | 31/12/2025 |
| 735 | Railways | Ministry of Railways | 705694 | Provision of Work-site Tampers [WST] Railway Project | 188 | 141.91 | 31/12/2023 | 31/01/2026 | |
| 736 | Railways | Ministry of Railways | 705708 | WST Machine Procurement Project | 176 | 31/03/2024 | 31/12/2027 | ||
| 737 | Railways | Ministry of Railways | 705710 | PCT Machine Procurement Project | 336 | 74.32 | 01/04/2024 | 30/06/2027 | |
| 738 | Railways | Ministry of Railways | 705712 | RBMV Machine Procurement Project | 480 | 0.33 | 30/06/2024 | 31/12/2027 | |
| 739 | Railways | Ministry of Railways | 705717 | SRGM Machine Procurement Project | 440 | 390.03 | 31/12/2023 | 31/03/2026 | |
| 740 | Railways | Ministry of Railways | 705720 | WST Machine Procurement Project | 384 | 01/04/2024 | 31/12/2026 | ||
| 741 | Railways | Ministry of Railways | 705721 | DTS Machine Procurement Project | 448 | 31/12/2024 | 31/12/2026 | ||
| 742 | Railways | Ministry of Railways | 705722 | BRM Machine Procurement Project | 210 | 0.02 | 30/06/2024 | 31/12/2027 | |
| 743 | Railways | Ministry of Railways | 705726 | Track Machine Procurement Project | 6339 | 4166.47 | 01/03/2025 | 31/01/2028 | |
| 744 | Railways | Ministry of Railways | 705728 | Mumbai-Ahmedabad High Speed Rail Project- 508 km | 108000 | 108000 | 82967.9 | 31/08/2027 | 31/12/2029 |
| 745 | Railways | Ministry of Railways | 705730 | Joka-BBD Bag new metro project | 4835 | 10362 | 4634.68 | 31/12/2026 | 31/12/2029 |
| 746 | Railways | Ministry of Railways | 705735 | Solapur-tuljapur-Osmanabad | 905 | 3295.74 | 1153.7 | 31/03/2027 | 28/03/2028 |
| 747 | Railways | Ministry of Railways | 705741 | Jeypore-Navarangpur New Rail Line Project | 748 | 748 | 12.06 | 31/07/2028 | 31/12/2029 |
| 748 | Railways | Ministry of Railways | 705742 | Jeypore-Malkanagiri New Railway Line Project | 2344 | 489.57 | 31/07/2033 | 31/07/2033 | |
| 749 | Railways | Ministry of Railways | 705752 | Gudha-Thatha Mithri Construction of Railway Track Project | 819 | 967.06 | 384.28 | 30/11/2026 | 30/11/2026 |
| 750 | Railways | Ministry of Railways | 705761 | SHIMOGA - SHIKARIPURA - RANEBENNUR [96 Km] | 1454 | 1454 | 71.89 | 01/12/2027 | 30/06/2028 |
| 751 | Railways | Ministry of Railways | 705763 | Indore - Budni New Railway Line [198 kms] | 7474 | 7474 | 1780.6 | 30/09/2030 | 30/09/2030 |
| 752 | Railways | Ministry of Railways | 705764 | Nimach-Badi Sadri New Rail Line Project | 495 | 825 | 123.77 | 31/03/2026 | 30/06/2026 |
| 753 | Railways | Ministry of Railways | 705765 | Gomoh - Flyover for DN trains | 686 | 686 | 574.14 | 26/03/2026 | 26/03/2026 |
| 754 | Railways | Ministry of Railways | 705766 | Lalitpur-Birari with flyover at Lalitpur- 16 Km | 304 | 356 | 231.37 | 31/12/2024 | 31/01/2026 |
| 755 | Railways | Ministry of Railways | 705771 | Allahabad-Bamhrauli Flyover Construction & 4th Railway Line Project | 494 | 494 | 333 | 31/03/2026 | 26/03/2026 |
| 756 | Railways | Ministry of Railways | 705772 | Mughalsarai-Allahabad, 3rd line | 2649 | 2649.44 | 1561.89 | 31/12/2026 | 31/03/2027 |
| 757 | Railways | Ministry of Railways | 705774 | Aligarh -Daud Khan Flyover Construction & 3rd Railway Line Project | 758 | 779.49 | 387.73 | 31/01/2025 | 31/03/2027 |
| 758 | Railways | Ministry of Railways | 705777 | Bhandai - Flyover for Etawah bound down train- 10 Km | 250 | 250.18 | 115.05 | 28/02/2026 | 28/02/2027 |
| 759 | Railways | Ministry of Railways | 705779 | Phephna-Indara, Mau-Shahganj doubling excluding Indara-Mau | 1178 | 1777 | 1489.5 | 31/12/2024 | 31/03/2026 |
| 760 | Railways | Ministry of Railways | 705780 | Bhatni-Aurnihar with electrification excluding Indara-Mau | 2529 | 2529.46 | 2051.69 | 31/12/2024 | 31/10/2025 |
| 761 | Railways | Ministry of Railways | 705782 | Barabanki-Malhaur 3rd & 4th Railway Line Project | 407 | 407 | 317 | 31/03/2025 | 31/03/2026 |
| 762 | Railways | Ministry of Railways | 705783 | Ludhiana- Killa Raipur Railway Doubling Project | 238 | 238 | 134.48 | 31/03/2025 | 31/03/2026 |
| 763 | Railways | Ministry of Railways | 705784 | Janghai-Phaphamau Doubling Rail Line Project | 357 | 978.77 | 579 | 31/03/2025 | 31/03/2025 |
| 764 | Railways | Ministry of Railways | 705785 | Lodhma - Piska - Link Line bypassing Hatia/Ranchi with Y connection | 473 | 473 | 288.59 | 30/06/2026 | 31/05/2027 |
| 765 | Railways | Ministry of Railways | 705789 | Penukonda - Dharmavaram Doubling Project [41.5 Km] | 308 | 307.66 | 259.52 | 31/03/2026 | 31/03/2026 |
| 766 | Railways | Ministry of Railways | 705793 | New Delhi- Mumbai Speed Booster[160Kmph] Project | 6806 | 135.65 | 31/03/2024 | ||
| 767 | Railways | Ministry of Railways | 705794 | New Delhi- Howrah Speed Booster[160Kmph] Project | 6685 | 127.03 | 31/03/2024 | ||
| 768 | Railways | Ministry of Railways | 705799 | Nagpur- Nagbhir Railway Line Gauge Conversion Project | 1400 | 1400 | 1472 | 31/12/2025 | 25/12/2025 |
| 769 | Railways | Ministry of Railways | 705912 | Sawai Madhopur-Jaipur Railway Line Project | 1204 | 94.76 | 31/03/2027 | ||
| 770 | Railways | Ministry of Railways | 705919 | Agra Fort-Bandikui Doubling Line Project | 1390 | 1390 | 123 | 30/06/2027 | 27/06/2027 |
| 771 | Railways | Ministry of Railways | 705933 | Nimach-Ratlam Doubling [133 Km] | 1096 | 1095.88 | 1067.49 | 31/10/2027 | 31/10/2027 |
| 772 | Railways | Ministry of Railways | 706757 | Modasa-Shamlaji Road Railway Line Project | 262 | 262 | 337.45 | 31/03/2025 | 31/03/2027 |
| 773 | Railways | Ministry of Railways | 706759 | Rampur Dumra-Tal-Rajendrapul Additional Bridge and Railway Line Doubling | 2374 | 1700.24 | 1427.78 | 01/12/2024 | 31/12/2025 |
| 774 | Railways | Ministry of Railways | 706763 | Rajkot - Kanalus Doubling Project [111.2 Kms] | 1081 | 1080.58 | 822.77 | 31/10/2026 | 31/10/2026 |
| 775 | Railways | Ministry of Railways | 706776 | Noapara-Barasat via Bimanbandar - Construction of Metro railway [18 km] | 4830 | 4830 | 2764.13 | 31/08/2026 | 31/03/2029 |
| 776 | Railways | Ministry of Railways | 706777 | Baranagar-Barrackpore and Dakshineshwar- Construction of Metro Railway | 2298 | 2734 | 393.01 | 31/12/2026 | 26/12/2025 |
| 777 | Railways | Ministry of Railways | 706779 | Mumbai Urban Transport Project [MUTP] - PHASE II | 8087 | 8087 | 7364 | 31/03/2014 | 31/12/2027 |
| 778 | Railways | Ministry of Railways | 706780 | Mumbai Urban Transport Project [MUTP] Phase-IIIA | 33690 | 33690 | 2436.22 | 31/12/2027 | 31/12/2027 |
| 779 | Railways | Ministry of Railways | 706781 | Mumbai Urban Transport Project Phase-III | 10947 | 10947 | 5460.49 | 31/03/2022 | 31/12/2026 |
| 780 | Railways | Ministry of Railways | 706835 | Belgaum-Dharwad via Kittur [73.10Km] | 1591 | 0.38 | 31/12/2027 | 31/03/2029 | |
| 781 | Railways | Ministry of Railways | 706837 | Pradhan Kuntha Jn Line Doubling Project | 349 | 349.22 | 106.11 | 30/11/2027 | 27/11/2027 |
| 782 | Railways | Ministry of Railways | 706844 | Katihar - Kumedpur Doubling Line Project | 942 | 942 | 356 | 31/08/2027 | 31/08/2027 |
| 783 | Railways | Ministry of Railways | 706854 | Boridand - Ambikapur Doubling Line Project | 1376 | 1576.23 | 139.49 | 30/06/2030 | 30/06/2030 |
| 784 | Railways | Ministry of Railways | 706860 | Barauni-Bachwara [16 km] - 3rd & 4th line incl. Barauni yard remodelling [32 km] | 645 | 7.96 | 01/08/2025 | 31/10/2026 | |
| 785 | Railways | Ministry of Railways | 706866 | Sawaimadhopur Bye Pass Line Project | 304 | 304 | 51.64 | 31/03/2026 | 27/05/2027 |
| 786 | Railways | Ministry of Railways | 706898 | Khurda Road - Balangir Electrification of Railway Track Project | 268 | 0 | 31/03/2021 | ||
| 787 | Railways | Ministry of Railways | 706922 | Guwahati-Dibrugarh via Tinsukia & Simaluguri-Dibrugarh | 890 | 889.36 | 391.73 | 03/09/2020 | 30/06/2024 |
| 788 | Railways | Ministry of Railways | 706940 | Mariani-Jorhat, Tinsukia-Dangri and Makum -TirapTrack Electrification Project | 184 | 0 | 31/05/2024 | ||
| 789 | Railways | Ministry of Railways | 706942 | Harmuty-Murkongselek Branch Line Electrification Project | 238 | 0 | 31/05/2024 | ||
| 790 | Railways | Ministry of Railways | 706950 | Hospet-Hubli-Vasco da Gama Line Electrification Project | 744 | 1122.62 | 969.05 | 31/03/2023 | 31/03/2024 |
| 791 | Railways | Ministry of Railways | 709808 | PACHORA-JAMNER WITH EXTENSION UPTO MALKAPUR NG TO BG | 955 | 2093.82 | 130.42 | 31/08/2027 | 28/03/2028 |
| 792 | Railways | Ministry of Railways | 709812 | NADIAD-PETLAD [37.26 KM] | 462 | 92.88 | 30/06/2030 | 30/06/2030 | |
| 793 | Railways | Ministry of Railways | 709813 | NEW BG LINE INTERSECTION [5 NOS] BETWEEN GERATPUR-SANAND & BOTAD-AHMEDABAD [16.51 KM] | 437 | 19.06 | 30/06/2028 | 27/10/2027 | |
| 794 | Railways | Ministry of Railways | 709815 | 4TH LINE - BHATAPARA-HATHBAND [8.8 KM] [PB-72/NR/2022-23] | 177 | 177.03 | 31/01/2027 | 31/12/2027 | |
| 795 | Railways | Ministry of Railways | 709816 | 4TH LINE - BHILAI-BHILAI NAGAR [8.8 KM] [PB-72/NR/2022-23] | 177 | 177.34 | 1.64 | 28/02/2027 | 28/02/2027 |
| 796 | Railways | Ministry of Railways | 709817 | 4TH LINE - DADHAPARA-BELHA [9.2 KM] [PB-72/NR/2022-23] | 169 | 169.06 | 17.84 | 30/11/2026 | 26/11/2026 |
| 797 | Railways | Ministry of Railways | 709818 | 4TH LINE RAJNANDGAON-DONGARHGARH [31.2 KM] [PB-72/NR/2022-23] | 328 | 328.34 | 56.1 | 31/01/2027 | 31/01/2027 |
| 798 | Railways | Ministry of Railways | 709819 | 3RD AND 4TH LINE - SARAGBUNDIA AND MADWARANI | 168 | 0.09 | 31/12/2026 | 31/12/2026 | |
| 799 | Railways | Ministry of Railways | 900874 | JHAJHA - BATIA | 588 | 0.8 | 31/03/2028 | 30/01/2030 | |
| 800 | Metals & Mining | Ministry of Steel | 615202 | Capacity expansion of Deposit-14 and 14 NMZ at Kirandul | 1700 | 1756.2 | 133.22 | 31/12/2028 | 27/03/2028 |
| 801 | Steel | Ministry of Steel | 400065 | Installation of 4th Slab Caster along with its Auxiliaries and a New Ladle Furnace in SMS-II at Rourkela Steel Plant | 1105 | 790.11 | 15/05/2025 | 30/09/2025 | |
| 802 | Steel | Ministry of Steel | 400121 | Construction of Screening Plant-II for Donimalai and Kumaraswamy Iron Ore Mining Complex of NMDC Limited at Ballari Dt, Karnataka. | 1044 | 288.87 | 25/08/2026 | ||
| 803 | Steel | Ministry of Steel | 400174 | New Sinter Plant at BSL, SAIL | 1034 | 1752.3 | 885.26 | 31/10/2017 | 30/06/2027 |
| 804 | Steel | Ministry of Steel | 612781 | Rebuilding of COB 4 at Durgapur Steel Plant | 917 | 146.64 | 08/12/2026 | ||
| 805 | Steel | Ministry of Steel | 617242 | Installation of New Bar Mill at Durgapur Steel Plant | 2115 | 236.73 | 30/06/2027 | ||
| 806 | Steel | Ministry of Steel | 617243 | Replacement of Hot Leveller No.1 of Plate Mill at Bhilai Steel Plant | 199 | 12.21 | 29/07/2026 | ||
| 807 | Steel | Ministry of Steel | 617246 | Up-gradation of Blast Furnace No. 3 at Durgapur Steel Plant | 758 | 85.89 | 07/06/2026 | ||
| 808 | Steel | Ministry of Steel | 617248 | Third Ladle Furnace in Secondary Refinery Unit at IISCO Steel Plant | 228 | 27.2 | 17/07/2026 | ||
| 809 | Steel | Ministry of Steel | 617249 | Replacement of existing Grinders in CRM-I & II at Bokaro Steel Plant | 212 | 16.04 | 27/01/2027 | ||
| 810 | Steel | Ministry of Steel | 617250 | Secondary Emission Control in Converters of SMS-II at Bokaro Steel Plant | 207 | 15.76 | 25/10/2026 | ||
| 811 | Steel | Ministry of Steel | 617251 | Revamping of Air Pollution Control Systems of SP-1 at Durgapur Steel Plant | 196 | 5.96 | 27/05/2026 | ||
| 812 | Steel | Ministry of Steel | 617253 | Revamping of old sub-systems of Blast Furnace 3 at Bokaro Steel Plant | 514 | 257.89 | 03/07/2025 | 30/11/2025 | |
| 813 | Steel | Ministry of Steel | 617254 | Replacement of remaining 04 sets of Battery Cyclones with 04 Nos. of ESPs in Sinter Plant-1 at Bokaro Steel Plant | 260 | 54.89 | 29/06/2026 | ||
| 814 | Steel | Ministry of Steel | 617255 | Replacement of Converter Vessels, Trunnion Rings, Support System & Installation of Secondary Emission at Bhilai Steel Plant | 472 | 158.07 | 14/06/2026 | ||
| 815 | Steel | Ministry of Steel | 617256 | Rebuilding of Coke Oven Battery No.7 & 8 at Bhilai Steel Plant | 884 | 506.96 | 31/10/2025 | ||
| 816 | Steel | Ministry of Steel | 617257 | Rebuilding of Coke Oven Battery No.6 at Bokaro Steel Plant | 627 | 153.32 | 15/11/2026 | ||
| 817 | Steel | Ministry of Steel | 617338 | Stamp Charge Battery No.12 Battery Proper at IISCO Steel Plant | 2518 | 152.23 | 20/07/2028 | ||
| 818 | Steel | Ministry of Steel | 706811 | NMDC Slurry Pipeline Project Phase-1 | 2907 | 5427 | 3179.93 | 30/06/2023 | 31/12/2025 |
| 819 | Steel | Ministry of Steel | 709826 | SCREENING PLANT-III AT KIRANDUL | 2719 | 1384.73 | 31/01/2026 | ||
| 820 | Steel | Ministry of Steel | 709827 | CONSTRUCTION OF RESIDENTIAL TOWERS AT BIOM KIRANDUL COMPLEX | 350 | 294.65 | 31/12/2025 |